The Liberty University football team was in need of a new indoor practice venue as it prepared to reclassify to the upper echelons of Division I college football.
Having opened in August of 2017, the $29 million 95,000 square-foot structure now stands as one of the best indoor practice facilities in all of college football – and a symbol of the program’s transformation.
In order to get the multi-purpose facility up and running in time for the team to begin preparations for the 2017 season, installers at W.H. Stovall & Company – a Virginia-based engineering building company – were tasked with fast-tracking the construction process.
Not only did W.H. Stovall require accurate shop drawings to keep what Liberty Athletic Director Ian McCaw dubbed as a “game-changing facility” on time and on budget, but it needed them in-house quicker than normal to keep the project progressing.
Metl-Span’s team of expert professionals stepped in to deliver game-changing insulated metal panels (IMPs), along with the guidance and expertise of its in-house drafting program. It’s that type of dependability and prompt reaction time to questions that helped W.H. Stovall estimator Jack Eaton keep the project on plan and avoid the pitfalls that often come along with delayed construction schedules.
“We needed to get the shop drawings produced and we needed to get all the submittals going,” Eaton said. “We were able to order and have Metl-Span produce them in a faster manner than it would normally take, and that made a big difference.”
The difference was evident in the final product, as over 30,000 square feet of Metl-Span CF Mesa panels now house the football team as well as a variety of student-athlete practices throughout the year.
The facility’s CF Mesa panels feature a double joint system that provides redundancy against leakage, building a barrier that protects the facility and its athletes from harsh weather conditions. The prefabricated panels consist of a rigid, continuous urethane core that provides consistent insulation and R-value. The panels’ single-source solution along with all-weather installation allows for expedited installation times that helped the University stick to its compressed construction timeline.
The efficiency and insulating values of Metl-Span’s panels are matched only by their aesthetic value. The sandstone and polar white color palettes create an inviting façade on campus that greets players, coaches and students alike at the gateway to Liberty University’s athletics corridor on the Lynchburg, Va., campus.
“Anybody who’s seen pictures from Liberty are impressed, because it’s a big footprint of Metl-Span product and it looks really good,” Eaton said.
Visit metlspan.com/IMP to watch as Eaton discusses the key difference Metl-Span made on the Liberty Practice Facility project.
Related Stories
Sponsored | | Sep 30, 2014
How project managers can manage technology
Not long ago, the role of a construction project manager revolved around working with people: employees, vendors, consultants, designers, subcontractors and owners. Today, project managers primarily manage information. SPONSORED CONTENT
| Sep 24, 2014
5 business lessons from a 43-year Star veteran
Mary Ed Cain was supposed to be born a boy. That was the first time she surprised everyone. The second time came on a daily basis during her 43-year career at Star Building Systems. SPONSORED CONTENT
| Jul 21, 2014
16 utility questions to answer during your building project
We need electricity to power our building projects, along with water and gas and a faultless sanitation system. That’s what we think about when we think about utility requirements for our building project, but are we missing something? SPONSORED CONTENT
Sponsored | | Jul 17, 2014
A major hop forward
The construction of efficient metal buildings has helped Perrault Farms expand its hops-harvesting business.
| Jul 17, 2014
22 land questions to decide if your build site works
When you’re ready to build, land needs a serious amount of attention. Since it can singlehandedly shift your building plans, land must be investigated, questioned, and eyed from every angle. SPONSORED CONTENT
| Jul 9, 2014
The one misstep that could be slowing your company’s growth
Change. It’s inevitable. And success for any professional may very well depend on how well we adapt to it. SPONSORED CONTENT
| May 27, 2014
Contractors survey reveals improving construction market
The construction industry is on the road to recovery, according to a new survey by Metal Construction News. Most metrics improved from the previous year’s survey, including a 19.4% increase in the average annual gross contracting sales volume. SPONSORED CONTENT
| May 11, 2014
8 starter questions to answer when thinking about building
So, are you ready to start building? Completing these eight questions will help you answer that confidently. SPONSORED CONTENT
| Apr 25, 2014
A radiant barrier FAQ: Everything you wanted to know but were afraid to ask
There are many examples of materials developed for the space program making their way into everyday life and radiant barriers are just that. SPONSORED CONTENT
| Apr 17, 2014
6 details that can throw off your schedule
In 1997, Apple told us to “Think Different.” So we did. We thought about what could happen if the world went mobile, if information was boundless, if we could carry our office in our back pocket. We’ve grown to love different and to expect change. And when it comes to Apple products, that’s not such a bad thing. When it comes to your building order, however, it’s not nearly as appealing.