In Miami, construction of OKO Group and Cain International’s 830 Brickell office tower is nearing completion. The building’s general contractor, Civic Construction, recently topped off construction at 55 stories. When complete later this year, the 724-foot-tall tower will be the first standalone office tower developed in Miami’s urban core in more than a decade, according to a statement from the developers.
Located in Miami’s Brickell Financial District, 830 Brickell was designed by architecture firm Adrian Smith + Gordon Gill, with interiors by Italian architecture and design company Iosa Ghini Associati. Over 60% leased, 830 Brickell has attracted tenants such as Microsoft, Thoma Bravo, A-CAP, CI Financial, Marsh Insurance, AerCap, and WeWork.
The tower’s hotel-style amenities include a rooftop bar/lounge and restaurant that offer views of the City and Biscayne Bay, a health and wellness center, an outdoor terrace, cafés, street-level retail, and conferencing facilities. Together with the developers, the building’s designers have incorporated pandemic-informed features such as ultraviolet lighting in air filtration systems, touchless technologies, and ultraviolet germicidal irradiation (UVGI) sanitation.
830 Brickell’s exterior has over 1 million square feet of uninterrupted glass. Serving as the tower’s podium, an eight-story parking garage is wrapped in a kinetic wall: a sprawling sheet of aluminum squares that move in the wind, reflecting the neighborhood’s movement and light. Nearby transit options include Metrorail and Metromover, the Brightline, walking paths, cycling lanes, and bay access points.
On the Building Team:
Developer: OKO Group and Cain International
Design architect: Adrian Smith + Gordon Gill Architecture
Interior design: Iosa Ghini Associati
Landscape architect: Enea Landscape Architecture
Executive architect: Revuelta Architecture International
General contractor: Civic Construction
Related Stories
| May 1, 2012
Gilbane to build $100 million cranberries manufacturing facility
Gilbane to provide design build services for a new Lean manufacturing facility for Ocean Spray Cranberries Inc., beverage products.
| Apr 30, 2012
Summit Design + Build completes build-out for Office Concepts
The project is seeking LEED ID Silver certification from the U.S. Green Building Council.
| Apr 30, 2012
KBE Building completes renovation at the ConnCAT
The $1.2 million project consisted of a 16,000-sf interior renovation.
| Apr 27, 2012
GreenExpo365.com to offer webinars on EPA’s WaterSense Program
Architects and builders interested in developing water-efficient buildings invited to attend free sessions featuring experts discussing water-efficient building practices.
| Apr 27, 2012
China Mobile selects Leo A Daly to design three buildings at its new HQ
LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.
| Apr 24, 2012
ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014
Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.
| Apr 24, 2012
AECOM design and engineering team realizes NASA vision for Sustainability Base
LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.
| Apr 23, 2012
Innovative engineering behind BIG’s Vancouver Tower
Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.
| Apr 23, 2012
Thornton Tomasetti project wins AISC Merit Award
Thornton Tomasetti provided structural design services through construction administration to architect HOK for the 1.6-million-sf tower and tiara structure, which comprises 15 steel tube arches spanning approximately 158 feet horizontally and 130 feet vertically from the top of the main building roof.
| Apr 20, 2012
Century-old courthouse renovated for Delaware law firm offices
To account for future expansion, Francis Cauffman developed a plan to accommodate the addition of an 8-story tower to the building.