American Airlines Arena, home to the Miami Heat basketball franchise, officially got into the restaurant and event business on Jan. 25, when it held a private party to debut 601, an 11,500-sf multipurpose space that offers fans and patrons a la carte dining, tapas, specialty drinks, and a variety of craft beers.
601 (the number of the arena’s address, 601 Biscayne Boulevard) fills a space that had been vacant since June 2014, when Gloria and Emilio Estaban closed Bongos Cuban Café. The couple had leased that space for 15 years.
The Heat Group, which manages the arena, took a couple of years to decide what it wanted to do with this space, says Michael McCullough, its Executive Vice President and Chief Marketing Officer. The Heat Group considered leasing the space to a franchise, but chose instead to turn it into an event space—“not unlike a hotel ballroom,” says McCullough—that can host weddings, office parties, bar mitzvahs, and other gatherings.
A sprawling 5,000-sf private dining space on the lower level can handle large corporate and social events.
In converting this space to 601, The Heat Group worked with DLR Group, the same architectural firm it used last year to retrofit the arena’s 23,000-sf East Plaza into a solar pavilion. “They are very forward thinking,” says McCullough about the firm. Brodson Construction, based in South Florida, was the contractor of record.
American Airlines Arena already had several food and entertainment venues, including the upscale restaurant/lounge Dewar’s VIP Lounge, and a number of franchises included Pincho factory and Pubbelly’s.
But 601 is different, says McCullouch, because of its flexibility and menu. It can offer a quick-service menu, a chef’s table, or whatever dining a client might want from its state of the art kitchens. “The main thing that we tried to do here was bring the landscape of Miami, reflect it in the offerings,” Rufino Rengifo, 601’s executive chef, told News 7 Miami.
A 5,000-sf “ballroom-like” area within 601 can handle different sized groups, and offer casual or fine dining. Image: Courtesy The Heat Group
The upstairs area includes a self-serve craft beer wall, for which customers can buy a card and draw their own drafts. The space also has a Tumbler bar with a range of mixed drinks and wine, and phone-charging stations at every table. And it's right on Biscayne Bay.
601 is open to all ticketholders 90 minutes before and up to two hours after every Heat game, as well as select Arena events like concerts.
Now that it’s been open a month, McCullough says no booking patterns have emerged. But 601 doesn’t seem to be cutting into the business of the Arena’s other dining spaces, or its skyboxes. (The Heat ranks among the NBA’s leaders in attendance.) McCullough notes, though, that when the Heat is playing, 601 seems to be drawing smaller groups.
Related Stories
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.
| Feb 24, 2012
Skanska hires Tingle as senior VP and national director for its Sports Center of Excellence
Tingle has worked in the architecture and construction industries for more than 30 years, and for the last 23 years, he has focused primarily on large-scale sports construction projects
| Feb 2, 2012
Shawmut Design and Construction launches sports venues division
Expansion caps year of growth for Shawmut.
| Jan 31, 2012
Fusion Facilities: 8 reasons to consolidate multiple functions under one roof
‘Fusing’ multiple functions into a single building can make it greater than the sum of its parts. The first in a series on the design and construction of university facilities.
| Nov 29, 2011
SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China
Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.
| Nov 11, 2011
Streamline Design-build with BIM
How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.
| Nov 9, 2011
Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers
Program leads the industry in recovering and recycling roofing membrane into new roofing products.
| Nov 1, 2011
Sasaki expands national sports design studio
Sasaki has also added Stephen Sefton to the sports design studio as senior associate.
| Oct 20, 2011
UNT receives nation’s first LEED Platinum designation for collegiate stadium
Apogee Stadium will achieve another first in December with the completion of three wind turbines that will feed the electrical grid that powers the stadium.