flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Michael Van Valkenburg Assoc. wins St. Louis Gateway Arch design competition

Michael Van Valkenburg Assoc. wins St. Louis Gateway Arch design competition


September 22, 2010

ST. LOUIS – Landscape architect Michael Van Valkenburgh and a multidisciplinary team of experts in “urban renewal, preservation, commemoration, social connections and ecological restoration” have been picked for the planning phase of The City+The Arch+The River 2015 International Design Competition.

The jury chose the MVVA Team over four others competing to enliven the area around the Gateway Arch and connect it to downtown St. Louis, the Mississippi River and the Illinois bank. Based in New York, MVVA’s portfolio includes the redesign of Pennsylvania Avenue at the White House, the design of Brooklyn Bridge Park and many other prominent projects. (Please see the MVVA Team profile at end of this document for information on expertise and accomplishments of its members.)

In its final report, the competition jury called the MVVA Team “a strong team with solid methodology.” As a team, “they convey intelligence and provide clear technical support for their design proposals,” the jury report states.

“MVVA is an outstanding team that presented a winning combination of the ambitious and the manageable,” said Tom Bradley, Superintendent of the Jefferson National Expansion Memorial. “They showed great reverence for the beauty and significance of the existing site, while suggesting improvements and attractions in line with our competition goals. We’re excited to start planning.”

Over a 90?day period, the team will work in partnership with the sponsors, the City of St. Louis, the National Park Service and others to further define program requirements; begin developing a design that takes into account the feasibility and practicality of proposed solutions; create a construction budget and fundraising plan; and define the delivery expectations from now until 2015.

“Between now and January, we will be challenging the MVVA Team to rise to the challenge to do what’s best for the city, for the region and for this national park,” said St. Louis Mayor Francis Slay. “The Arch is a national treasure, but it is intensely personal to people in and around St Louis. We will be working with Michael and his team, with continued input from the community and the experts, on creating the best solutions for the Arch grounds and the neighboring area.”“There is huge potential for the Illinois riverbank area and collaboration on both sides of the river,” said Dr. Vaughn Vandegrift, Chancellor of Southern Illinois University at Edwardsville, who serves with Bradley, Mayor Slay and others on the competitions governing group. “Our discussions regarding Illinois intensified and evolved even after the competition was launched. There are opportunities for the Illinois riverbank area now that didn’t exist when we gave instructions to the teams. We will work closely with the MVVA Team to evaluate what they have proposed and expand from there.”

Strong support for project implementation was shared last month in a letter to competition organizers from the bi?partisan Missouri and Illinois congressional delegations and during a visit by the U.S. Secretary of the Interior, Ken Salazar, who oversees the National Park Service and pledged to get the project done.

“This is another critical step in a continuum that began with the review of the park’s general management plan and continued on to the call for a competition, the skillful execution of the competition itself, today’s announcement of a winning design team, the establishment of an implementation team and a concept from which we can build,” said Bradley. “We are looking to this effort as a model for both public?private collaboration and improved connections between cities and our urban national parks.”

The MVVA Team’s design concept narrative describes their vision for the redesigned park as a “centerpiece of civic culture, an engine of regional economic growth, a showcase for sustainable ecological restoration and a celebration of the national significance of this historic place.”

The sponsoring group, the MVVA Team and others will host intensive reviews and workshops this fall to analyze the design concept and conduct a more detailed design exploration. At a minimum, the study will focus on the review of the technical advisory group, the impact on related downtown park properties and the Illinois side of the river, traffic and transportation and federal compliance issues.

The sponsors also will study issues relating to cost and construction, traffic, financial resources and federal compliance.

A monthly web?based progress report will update the public throughout the implementation period.

The eight?member jury counted among its members a Pulitzer Prize?winning architecture critic, a professor in the humanities, a former deputy director of the National Park Service, a real estate economist, a museum curator and renowned architects and landscape architects.

The jury shared its report and team rankings with the competition sponsor and managers after a series of presentations and tours of the community, competition site and exhibit of design concepts led by the sponsors and culminating in public presentations by the teams late last month.

The project will be constructed by Oct. 28, 2015, the 50th anniversary of the completion of the Arch.

About the Competition

The goal of The City+The Arch+The River 2015 international design competition is to create an iconic setting for the international icon, the Gateway Arch, honoring its immediate surroundings and weaving connections and transitions from the city and the Arch grounds to the Mississippi River, including the east bank in Illinois.

The competition, launched Dec. 8, 2009, has had three stages. Portfolio submissions in Stage I included a description of the lead designer, a statement of design intent and philosophy of the lead designer, a profile of the design team and examples of their work. From the original 49 submissions, in February 2010, the jury picked nine to enter Stage II.

Stage II involved the formation of the complete teams capable of executing the project, submission of required qualifications and a jury interview. This phase culminated in early April 2010, when the teams met with the jury and the field was narrowed to five teams.

On April 28, 2010, at the beginning of Stage III, the finalist teams presented their design philosophies and examples of past work at a public “Meet the Design Teams” event in downtown St. Louis, hosted by sportscaster Joe Buck. This event was followed by a three month design concept competition to explore the finalists’ design approach and test their working methodology.

The design concepts went on display on Aug. 17, 2010, at the Arch and in an exhibit traveling throughout the bi?state region. Visitors were able to voice opinions about the design concepts in the first week of the exhibit. A synopsis of the more than 600 comments received was shared with the jury. The finalist teams presented their design concepts to the jury in public session on Aug. 26, 2010.

The final project design, budget and implementation plan will be presented in January 2011. The project will be constructed by Oct. 28, 2015.

The new design is called for in the National Park Service’s General Management Plan for the Jefferson National Expansion Memorial, which was developed with extensive public input over an 18?month period and approved Nov. 23, 2009.

The competition is sponsored by the CityArchRiver 2015 Foundation, which includes National Park Superintendent Tom Bradley, St. Louis Mayor Francis G. Slay, community leaders from Missouri and Illinois, academics, architects and national park advocates.

Financial contributions to the CityArchRiver 2015 Foundation are being handled by the Greater St. Louis Community Foundation, a public charity with more than $140 million in charitable assets and representing more than 350 individual funds.

Donors to the competition include: Emerson, Gateway Center of Metropolitan St. Louis (Malcolm W. Martin Memorial Park), Peter Fischer, Emily Rauh Pulitzer, Civic Progress, Wachovia Wells Fargo Foundation, Danforth Foundation, John F. McDonnell, Bryan Cave LLP, Greater St. Louis Community Foundation, National Park Foundation, Monsanto, Alison and John Ferring, Bank of America, David C. Farrell and others who choose to remain anonymous. The traveling exhibit was sponsored by Civic Progress member companies.

Related Stories

Women in Design+Construction | May 28, 2024

Commerce Department launches Million Women in Construction Community Pledge

The U.S. Department of Commerce launched its Million Women in Construction Community Pledge this month to boost the ranks of women in construction companies. Federal investments are creating a construction boom that is increasing job opportunities for construction and trade workers.

Laboratories | May 24, 2024

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 

MFPRO+ News | May 24, 2024

Austin, Texas, outlaws windowless bedrooms

Austin, Texas will no longer allow developers to build windowless bedrooms. For at least two decades, the city had permitted developers to build thousands of windowless bedrooms.

Resiliency | May 24, 2024

As temperatures underground rise, so do risks to commercial buildings

Heat created by underground structures is increasing the risk of damage to buildings, recent studies have found. Basements, train tunnels, sewers, and other underground systems are making the ground around them warmer, which causes soil, sand, clay and silt to shift, settle, contract, and expand.

Sports and Recreational Facilities | May 23, 2024

The Cincinnati Open will undergo a campus-wide renovation ahead of the expanded 2025 tournament

One of the longest-running tennis tournaments in the country, the Cincinnati Open will add a 2,000-seat stadium, new courts and player center, and more greenspace to create a park-like atmosphere.

Mass Timber | May 22, 2024

3 mass timber architecture innovations

As mass timber construction evolves from the first decade of projects, we're finding an increasing variety of mass timber solutions. Here are three primary examples.

MFPRO+ News | May 21, 2024

Massachusetts governor launches advocacy group to push for more housing

Massachusetts’ Gov. Maura Healey and Lt. Gov. Kim Driscoll have taken the unusual step of setting up a nonprofit to advocate for pro-housing efforts at the local level. One Commonwealth Inc., will work to provide political and financial support for local housing initiatives, a key pillar of the governor’s agenda.

Building Tech | May 21, 2024

In a world first, load-bearing concrete walls built with a 3D printer

A Germany-based construction engineering company says it has constructed the world’s first load-bearing concrete walls built with a 3D printer. Züblin built a new warehouse from a single 3D print for Strabag Baumaschinentechnik International in Stuttgart, Germany using a Putzmeister 3D printer. 

MFPRO+ News | May 21, 2024

Baker Barrios Architects announces new leadership roles for multifamily, healthcare design

Baker Barrios Architects announced two new additions to its leadership: Chris Powers, RA, AIA, NCARB, EDAC, as Associate Principal and Director (Healthcare); and Mark Kluemper, AIA, NCARB, as Associate Principal and Technical Director (Multifamily).

MFPRO+ News | May 20, 2024

Florida condo market roiled by structural safety standards law

A Florida law enacted after the Surfside condo tower collapse is causing turmoil in the condominium market. The law, which requires buildings to meet certain structural safety standards, is forcing condo associations to assess hefty fees to make repairs on older properties. In some cases, the cost per unit runs into six figures.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021