flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Michael Van Valkenburg Assoc. wins St. Louis Gateway Arch design competition

Michael Van Valkenburg Assoc. wins St. Louis Gateway Arch design competition


September 22, 2010

ST. LOUIS – Landscape architect Michael Van Valkenburgh and a multidisciplinary team of experts in “urban renewal, preservation, commemoration, social connections and ecological restoration” have been picked for the planning phase of The City+The Arch+The River 2015 International Design Competition.

The jury chose the MVVA Team over four others competing to enliven the area around the Gateway Arch and connect it to downtown St. Louis, the Mississippi River and the Illinois bank. Based in New York, MVVA’s portfolio includes the redesign of Pennsylvania Avenue at the White House, the design of Brooklyn Bridge Park and many other prominent projects. (Please see the MVVA Team profile at end of this document for information on expertise and accomplishments of its members.)

In its final report, the competition jury called the MVVA Team “a strong team with solid methodology.” As a team, “they convey intelligence and provide clear technical support for their design proposals,” the jury report states.

“MVVA is an outstanding team that presented a winning combination of the ambitious and the manageable,” said Tom Bradley, Superintendent of the Jefferson National Expansion Memorial. “They showed great reverence for the beauty and significance of the existing site, while suggesting improvements and attractions in line with our competition goals. We’re excited to start planning.”

Over a 90?day period, the team will work in partnership with the sponsors, the City of St. Louis, the National Park Service and others to further define program requirements; begin developing a design that takes into account the feasibility and practicality of proposed solutions; create a construction budget and fundraising plan; and define the delivery expectations from now until 2015.

“Between now and January, we will be challenging the MVVA Team to rise to the challenge to do what’s best for the city, for the region and for this national park,” said St. Louis Mayor Francis Slay. “The Arch is a national treasure, but it is intensely personal to people in and around St Louis. We will be working with Michael and his team, with continued input from the community and the experts, on creating the best solutions for the Arch grounds and the neighboring area.”“There is huge potential for the Illinois riverbank area and collaboration on both sides of the river,” said Dr. Vaughn Vandegrift, Chancellor of Southern Illinois University at Edwardsville, who serves with Bradley, Mayor Slay and others on the competitions governing group. “Our discussions regarding Illinois intensified and evolved even after the competition was launched. There are opportunities for the Illinois riverbank area now that didn’t exist when we gave instructions to the teams. We will work closely with the MVVA Team to evaluate what they have proposed and expand from there.”

Strong support for project implementation was shared last month in a letter to competition organizers from the bi?partisan Missouri and Illinois congressional delegations and during a visit by the U.S. Secretary of the Interior, Ken Salazar, who oversees the National Park Service and pledged to get the project done.

“This is another critical step in a continuum that began with the review of the park’s general management plan and continued on to the call for a competition, the skillful execution of the competition itself, today’s announcement of a winning design team, the establishment of an implementation team and a concept from which we can build,” said Bradley. “We are looking to this effort as a model for both public?private collaboration and improved connections between cities and our urban national parks.”

The MVVA Team’s design concept narrative describes their vision for the redesigned park as a “centerpiece of civic culture, an engine of regional economic growth, a showcase for sustainable ecological restoration and a celebration of the national significance of this historic place.”

The sponsoring group, the MVVA Team and others will host intensive reviews and workshops this fall to analyze the design concept and conduct a more detailed design exploration. At a minimum, the study will focus on the review of the technical advisory group, the impact on related downtown park properties and the Illinois side of the river, traffic and transportation and federal compliance issues.

The sponsors also will study issues relating to cost and construction, traffic, financial resources and federal compliance.

A monthly web?based progress report will update the public throughout the implementation period.

The eight?member jury counted among its members a Pulitzer Prize?winning architecture critic, a professor in the humanities, a former deputy director of the National Park Service, a real estate economist, a museum curator and renowned architects and landscape architects.

The jury shared its report and team rankings with the competition sponsor and managers after a series of presentations and tours of the community, competition site and exhibit of design concepts led by the sponsors and culminating in public presentations by the teams late last month.

The project will be constructed by Oct. 28, 2015, the 50th anniversary of the completion of the Arch.

About the Competition

The goal of The City+The Arch+The River 2015 international design competition is to create an iconic setting for the international icon, the Gateway Arch, honoring its immediate surroundings and weaving connections and transitions from the city and the Arch grounds to the Mississippi River, including the east bank in Illinois.

The competition, launched Dec. 8, 2009, has had three stages. Portfolio submissions in Stage I included a description of the lead designer, a statement of design intent and philosophy of the lead designer, a profile of the design team and examples of their work. From the original 49 submissions, in February 2010, the jury picked nine to enter Stage II.

Stage II involved the formation of the complete teams capable of executing the project, submission of required qualifications and a jury interview. This phase culminated in early April 2010, when the teams met with the jury and the field was narrowed to five teams.

On April 28, 2010, at the beginning of Stage III, the finalist teams presented their design philosophies and examples of past work at a public “Meet the Design Teams” event in downtown St. Louis, hosted by sportscaster Joe Buck. This event was followed by a three month design concept competition to explore the finalists’ design approach and test their working methodology.

The design concepts went on display on Aug. 17, 2010, at the Arch and in an exhibit traveling throughout the bi?state region. Visitors were able to voice opinions about the design concepts in the first week of the exhibit. A synopsis of the more than 600 comments received was shared with the jury. The finalist teams presented their design concepts to the jury in public session on Aug. 26, 2010.

The final project design, budget and implementation plan will be presented in January 2011. The project will be constructed by Oct. 28, 2015.

The new design is called for in the National Park Service’s General Management Plan for the Jefferson National Expansion Memorial, which was developed with extensive public input over an 18?month period and approved Nov. 23, 2009.

The competition is sponsored by the CityArchRiver 2015 Foundation, which includes National Park Superintendent Tom Bradley, St. Louis Mayor Francis G. Slay, community leaders from Missouri and Illinois, academics, architects and national park advocates.

Financial contributions to the CityArchRiver 2015 Foundation are being handled by the Greater St. Louis Community Foundation, a public charity with more than $140 million in charitable assets and representing more than 350 individual funds.

Donors to the competition include: Emerson, Gateway Center of Metropolitan St. Louis (Malcolm W. Martin Memorial Park), Peter Fischer, Emily Rauh Pulitzer, Civic Progress, Wachovia Wells Fargo Foundation, Danforth Foundation, John F. McDonnell, Bryan Cave LLP, Greater St. Louis Community Foundation, National Park Foundation, Monsanto, Alison and John Ferring, Bank of America, David C. Farrell and others who choose to remain anonymous. The traveling exhibit was sponsored by Civic Progress member companies.

Related Stories

| Aug 11, 2010

SAFTI FIRST hires Tim Nass as National Sales Manager

SAFTI FIRST, a leading USA manufacturer of fire rated glazing and framing systems, is pleased to announce the addition of Tim Nass as National Sales Manager.  In his new role, Tim will be working closely with architects and contract glaziers in selecting the appropriate and most economical fire rated glazing solution for their project.   He will also be coordinating SAFTI FIRST’s extensive network of architectural representatives throughout the United States.

| Aug 11, 2010

NCARB welcomes new board of directors

The National Council of Architectural Registration Boards (NCARB) introduces its Board of Directors for FY10, who were installed during the culmination of the Council’s 90th Annual Meeting and Conference in Chicago.

| Aug 11, 2010

Berkebile wins $100K award for commitment to environment

Robert Berkebile, the founding principal of BNIM Architects and a founding member of the U.S. Green Building Council, has been selected to receive a $100,000 Heinz Award. The award honors his role in promoting green building design and for his commitment and action toward restoring social, economic, and environmental vitality to America’s communities through sustainable architecture and planning.

| Aug 11, 2010

Polshek Partnership unveils design for University of North Texas business building

New York-based architect Polshek Partnership today unveiled its design scheme for the $70 million Business Leadership Building at the University of North Texas in Denton. Designed to provide UNT’s 5,400-plus business majors the highest level of academic instruction and professional training, the 180,000-sf facility will include an open atrium, an internet café, and numerous study and tutoring rooms—all designed to help develop a spirit of collaboration and team-oriented focus.

| Aug 11, 2010

University of Florida aiming for nation’s first LEED Platinum parking garage

If all goes as planned, the University of Florida’s new $20 million Southwest Parking Garage Complex in Gainesville will soon become the first parking facility in the country to earn LEED Platinum status. Designed by the Boca Raton office of PGAL to meet criteria for the highest LEED certification category, the garage complex includes a six-level, 313,000-sf parking garage (927 spaces) and an attached, 10,000-sf, two-story transportation and parking services office building.

| Aug 11, 2010

Draft NIST report on Cowboys practice facility collapse released for public comment

A fabric-covered, steel frame practice facility owned by the National Football League’s Dallas Cowboys collapsed under wind loads significantly less than those required under applicable design standards, according to a report released today for public comment by the Commerce Department's National Institute of Standards and Technology (NIST).

| Aug 11, 2010

Callison, MulvannyG2 among nation's largest retail design firms, according to BD+C's Giants 300 report

A ranking of the Top 75 Retail Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021