flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Middough Inc. Celebrates its 60th Anniversary

Middough Inc. Celebrates its 60th Anniversary

Six decades of architecture, engineering and management services innovation and customer responsiveness mark an industry leader’s milestone event


September 21, 2010

CLEVELAND, Ohio (Aug. 26, 2010)— Middough Inc., a top ranking U.S. architectural, engineering and management services company, announces the celebration  of its 60th anniversary. This announcement was made by President and CEO, Ronald R. Ledin, PE.

When William V. Middough first opened the company in 1950, he based it on strong personal values where honesty and trust would be his guide and his word and handshake were as good as gold. These founding values remain true today and are the cornerstone of Middough’s success.

As Middough celebrates its 60th year in business, the company has developed many long-term relationships with its clients over the years. Middough is proud to have its very first client from the metals industry since its doors opened, as a key customer today, as well as many other long-term signature clients. Middough is proud to continue its legacy of being the company known for that special talent and expertise at providing innovation and “know-how” beyond traditional architectural, engineering and construction services.

“Middough has loyal clients and strives to provide each one with the one-on-one attention they so richly deserve,” states Ledin. “While maintaining our focus on expanding our client base, Middough has also invested in development and training, has acquired new technologies, expanded its executive leadership team and has moved into new geographic markets to continue the company’s growth to record levels.”

Middough has been able to diversify by expanding its industry base. As a top company within the industries it serves, Middough has grown to a full-service organization with more than 800 associates and has an integrated network of regional and local offices specializing in delivering complex process and facilities.

Notable accomplishments:

  • Formally founded as W. Vance Middough & Associates in 1950
  • Signed its first client who is still a client today, ArcelorMittal (formerly LTV Steel) in 1950
  • Assisted in the decision and implementation of the conversion of the Great Lakes Towing Co. fleet of tugboats from steam to diesel  in the 1950s
  • Provided engineering services for the conversion of the Staten Island Ferry’s from steam to diesel in 1965
  • Designed the power distribution system for Newton Falls, Ohio in the 1960s
  • William V. Middough is formally recognized in the “Who’s Who” in the 1960s
  • Middough performs international projects in the 1970s
  • Ronald R. Ledin, PE becomes president and CEO in 1978
  • Company relocates its corporate office to East 13th Street, Cleveland, Ohio in 1983
  • Company expands by opening two additional offices in Chicago, IL and Toledo, Ohio in 1995
  • Middough purchases MicroTech in Corning, NY in 1998
  • Company expands its offices to the east, south and west in the 2000s.
  • Services the pharmaceutical and biotechnology markets in 2005
  • Middough develops a major projects group in 2007
  • Hit 800 employee milestone mark in 2009
  • Celebrated 20 years being below the average OSHA Total Recordable Injury Rate (TRIR) for its Safety Management Program in 2010
  • Introduced its first brand campaign “Performance You Trust™” in 2010
  • Opened its newest office location in Northwest Indiana, bringing its total office locations to 13, in 2010

 

“Our goal is to build loyalty by delivering exceptional performance, quality and cost efficiencies to our clients,” expresses Ledin. “It’s this client focus for more than 60 years that has been central to our growth and has been an important factor in establishing Middough’s market leadership.”

As it begins its seventh decade, Middough has become a pivotal force in the industries it serves. The company’s growth plan includes diversification into new markets, expansion of current market base, geographic expansion and the establishment of new locations, solicitation of larger projects, increased strength and flexibility of project management utilizing Middough Advanced Project Procedures (M.A.P.P.), as well as continuing to provide its clients with performance they can trust.

About Middough Inc.

For more than 60 years, Middough Inc. has been recognized for its performance and leadership as an international company in architecture, engineering and management services. With major offices in Cleveland, Atlanta, Chicago, Houston, Philadelphia, Phoenix, St. Louis and Toledo and additional offices nationally comprising more than 800 professionals, Middough provides a full-range of traditional and specialized design, technical and management services worldwide.

For more information about Middough, visit www.middough.com.

 

###

Related Stories

| Nov 23, 2010

Honeywell's School Energy and Environment Survey: 68% of districts delayed or eliminated improvements because of economy

Results of Honeywell's second annual “School Energy and Environment Survey” reveal that almost 90% of school leaders see a direct link between the quality and performance of school facilities, and student achievement. However, districts face several obstacles when it comes to keeping their buildings up to date and well maintained. For example, 68% of school districts have either delayed or eliminated building improvements in response to the economic downturn.

| Nov 16, 2010

Architecture Billings Index: inquiries for new projects remain extremely high

The new projects inquiry index was 61.7, down slightly from a nearly three-year high mark of 62.3 in September, according to the Architecture Billings Index (ABI). However, the ABI dropped nearly two points in October; the October ABI score was 48.7, down from a reading of 50.4 the previous month. The ABI reflects the approximate nine to 12 month lag time between architecture billings and construction spending.

| Nov 16, 2010

Brazil Olympics spurring green construction

Brazil's green building industry will expand in the coming years, spurred by construction of low-impact venues being built for the 2016 Olympics. The International Olympic Committee requires arenas built for the 2016 games in Rio de Janeiro meet international standards for low-carbon emissions and energy efficiency. This has boosted local interest in developing real estate with lower environmental impact than existing buildings. The timing couldn’t be better: the Brazilian government is just beginning its long-term infrastructure expansion program.

| Nov 16, 2010

Green building market grows 50% in two years; Green Outlook 2011 report

The U.S. green building market is up 50% from 2008 to 2010—from $42 billion to $55 billion-$71 billion, according to McGraw-Hill Construction's Green Outlook 2011: Green Trends Driving Growth report. Today, a third of all new nonresidential construction is green; in five years, nonresidential green building activity is expected to triple, representing $120 billion to $145 billion in new construction.

| Nov 16, 2010

Calculating office building performance? Yep, there’s an app for that

123 Zero build is a free tool for calculating the performance of a market-ready carbon-neutral office building design. The app estimates the discounted payback for constructing a zero emissions office building in any U.S. location, including the investment needed for photovoltaics to offset annual carbon emissions, payback calculations, estimated first costs for a highly energy efficient building, photovoltaic costs, discount rates, and user-specified fuel escalation rates.

| Nov 16, 2010

CityCenter’s new Harmon Hotel targeted for demolition

MGM Resorts officials want to demolish the unopened 27-story Harmon Hotel—one of the main components of its brand new $8.5 billion CityCenter development in Las Vegas. In 2008, inspectors found structural work on the Harmon didn’t match building plans submitted to the county, with construction issues focused on improperly placed steel reinforcing bar. In January 2009, MGM scrapped the building’s 200 condo units on the upper floors and stopped the tower at 27 stories, focusing on the Harmon having just 400 hotel rooms. With the Lord Norman Foster-designed building mired in litigation, construction has since been halted on the interior, and the blue-glass tower is essentially a 27-story empty shell.

| Nov 16, 2010

Where can your firm beat the recession? Try any of these 10 places

Wondering where condos and rental apartments will be needed? Where companies are looking to rent office space? Where people will need hotel rooms, retail stores, and restaurants? Newsweek compiled a list of the 10 American cities best situated for economic recovery. The cities fall into three basic groups: Texas, the New Silicon Valleys, and the Heartland Honeys. Welcome to the recovery.

| Nov 16, 2010

Landscape architecture challenges Andrés Duany’s Congress for New Urbanism

Andrés Duany, founder of the Congress for the New Urbanism, adopted the ideas, vision,  and values of the early 20th Century landscape architects/planners John Nolen and Frederick Law Olmsted, Jr., to launch a movement that led to more than 300 new towns, regional plans, and community revitalization project commissions for his firm. However, now that there’s a societal buyer’s remorse about New Urbanism, Duany is coming up against a movement that sees landscape architecture—not architecture—as the design medium more capable of organizing the city and enhancing the urban experience.

| Nov 16, 2010

Just for fun: Words that architects use

If you regularly use such words as juxtaposition, folly, truncated, and articulation, you may be an architect. Architects tend to use words rarely uttered during normal conversations. In fact, 62% of all the words that come out of an architects mouth could be replaced by a simpler and more widely known word, according to this “report.” Review this list of designer words, and once you manage to work them into daily conversation, you’re on your way to becoming a bonafide architect.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021