Williams Design|Build and Williams Construction Management of St. Charles, Ill., announced it has acquired Vasilion Architects of Batavia, Ill. The two firms will now serve as a single source for architecture, design/build, and construction management under the new name Prairie Forge Group. Prairie Forge Group will be led by Thomas M. Tristano as president, David V. Stermetz as vice president and director of construction, and Steven J. Vasilion as director of architecture.
“We have aligned four decades of experience with the expertise of new, innovative team members to further enhance the service offerings we provide to our clients,” said Tristano. “The acquisition of Vasilion Architects was a natural step in our evolution. As we build upon our past resources and success, we remain focused on the core values upon which we established our firm decades ago – quality, people, and service.”
Prairie Forge Group is headquartered in St. Charles, with an office in Kansas City, Mo. The firm provides owners and clients throughout the Midwest region with innovative, timely and economical turnkey solutions. Areas of practice include municipal, parks and recreation, healthcare, commercial, multifamily, historic preservation, and religious and education sectors.
“Regardless of complexity, Prairie Forge Group works to serve as the project advocate from beginning to end,” said Stermetz. “While each project is addressed individually and solutions are tailored to job specifics, one thing remains consistent across the board: we serve our clients efficiently and effectively.”
Prairie Forge Group's completed projects include the Lake Forest Municipal Services Facility in Lake Forest, Ill.; St. Charles Fire Station No. 1; the Schwiebert Riverfront Park in Rock Island, Ill.; and the Bob & Edna Meadows Regional Cancer Care Center at St. Joseph Provena Hospital in Elgin, Ill. The firm has also completed projects for many park districts, recreation departments and municipalities throughout the state of Illinois.
“I am eager to join forces with Tom Tristano and his team,” said Vasilion. “Their vast knowledge and construction expertise is a tremendous resource. I believe in design|build and am thrilled to join forces on this new adventure.” +
Related Stories
| Aug 11, 2010
Florida mixed-use complex includes retail, residential
The $325 million Atlantic Plaza II lifestyle center will be built on 8.5 acres in Delray Beach, Fla. Designed by Vander Ploeg & Associates, Boca Raton, the complex will include six buildings ranging from three to five stories and have 182,000 sf of restaurant and retail space. An additional 106,000 sf of Class A office space and a residential component including 197 apartments, townhouses, ...
| Aug 11, 2010
Restoration gives new life to New Formalism icon
The $30 million upgrade, restoration, and expansion of the Mark Taper Forum in Los Angeles was completed by the team of Rios Clementi Hale Studios (architect), Harley Ellis Devereaux (executive architect/MEP), KPFF (structural engineer), and Taisei Construction (GC). Work on the Welton Becket-designed 1967 complex included an overhaul of the auditorium, lighting, and acoustics.
| Aug 11, 2010
Best AEC Firms to Work For
2006 FreemanWhite Hnedak Bobo Group McCarthy Building Companies, Inc. Shawmut Design and Construction Walter P Moore 2007 Anshen+Allen Arup Bovis Lend Lease Cannon Design Jones Lang LaSalle Perkins+Will SmithGroup SSOE, Inc. Timothy Haahs & Associates, Inc. 2008 Gilbane Building Co. HDR KJWW Engineering Consultants Lord, Aeck & Sargent Mark G.
| Aug 11, 2010
High-Performance Workplaces
Building Teams around the world are finding that the workplace is changing radically, leading owners and tenants to reinvent corporate office buildings to compete more effectively on a global scale. The good news is that this means more renovation and reconstruction work at a time when new construction has stalled to a dribble.
| Aug 11, 2010
Great Solutions: Business Management
22. Commercial Properties Repositioned for University USE Tocci Building Companies is finding success in repositioning commercial properties for university use, and it expects the trend to continue. The firm's Capital Cove project in Providence, R.I., for instance, was originally designed by Elkus Manfredi (with design continued by HDS Architects) to be a mixed-use complex with private, market-...
| Aug 11, 2010
Nurturing the Community
The best seat in the house at the new Seahawks Stadium in Seattle isn't on the 50-yard line. It's in the southeast corner, at the very top of the upper bowl. "From there you have a corner-to-corner view of the field and an inspiring grasp of the surrounding city," says Kelly Kerns, project leader with architect/engineer Ellerbe Becket, Kansas City, Mo.
| Aug 11, 2010
AIA Course: Historic Masonry — Restoration and Renovation
Historic restoration and preservation efforts are accelerating throughout the U.S., thanks in part to available tax credits, awards programs, and green building trends. While these projects entail many different building components and systems, façade restoration—as the public face of these older structures—is a key focus. Earn 1.0 AIA learning unit by taking this free course from Building Design+Construction.
| Aug 11, 2010
BIM adoption tops 80% among the nation's largest AEC firms, according to BD+C's Giants 300 survey
The nation's largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction's premier Top 50 BIM Adopters ranking, published as part of the 2009 Giants 300 survey. Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, half have more than 30 seats, and near...
| Aug 11, 2010
World's tallest all-wood residential structure opens in London
At nine stories, the Stadthaus apartment complex in East London is the world’s tallest residential structure constructed entirely in timber and one of the tallest all-wood buildings on the planet. The tower’s structural system consists of cross-laminated timber (CLT) panels pieced together to form load-bearing walls and floors. Even the elevator and stair shafts are constructed of prefabricated CLT.
| Aug 11, 2010
Integrated Project Delivery builds a brave, new BIM world
Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.