flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Milwaukee Bucks reveal more renderings of new downtown arena project

Sports and Recreational Facilities

Milwaukee Bucks reveal more renderings of new downtown arena project

The plan, led by Populous, includes a 714,000-sf arena and a 30-acre mixed-use development.


By Mike Chamernik, Associate Editor | March 18, 2016

All renderings courtesy Populous. Click photos to enlarge.

The NBA’s Milwaukee Bucks have many mottos attached to them — like “Green and Growing,” “Bucks in Six,” and “Fear the Deer” — but the team pushes one above all else. 

Own the Future.

They certainly are trying to do that. Along with a young, exuberant group of players, the Bucks continue to move towards a new downtown Milwaukee arena that will keep them in the city.

This week, the Bucks released new renderings and project specifications for their arena and surrounding mixed-use entertainment district, a plan led by Populous along with Eppstein Uhen and HNTB. 

The 714,000-sf arena is intended primarily for basketball but can also host hockey, concerts, and other events. Upper and lower levels will load from the top down for a more efficient seating pattern, and fans will be able to watch the action from the concourses. 

The building will have a hand-crafted zinc and glass exterior. A massive glass curtain wall will bring light and views into the atrium. The arced long-span roof will be clad in pre-patina zinc shingles, with six vertical glass “ripples” that allow light in. 

Perhaps intentionally, the building’s shape seems to honor Milwaukee’s heritage.

The 30-acre mixed-use development will have restaurants, bars and other entertainment based uses, including a plaza with a translucent canopy above it. 

The NBA mandated that the Bucks needed a new arena secured or else they would be sold to the league and potentially relocated. The team’s current home, the BMO Bradley Center, was built in 1988. The new arena project was announced last April and the Wisconsin state assembly approved the plan last July.

The entire plan will cost about $1 billion, half for the arena and half for the development. The arena is expected to be ready for the 2018-19 season, and the district, which will also add hotels, offices, and condos, will be built over the next 10 years.

The Bucks are also building a new training facility.

 

Related Stories

| Aug 11, 2010

Nurturing the Community

The best seat in the house at the new Seahawks Stadium in Seattle isn't on the 50-yard line. It's in the southeast corner, at the very top of the upper bowl. "From there you have a corner-to-corner view of the field and an inspiring grasp of the surrounding city," says Kelly Kerns, project leader with architect/engineer Ellerbe Becket, Kansas City, Mo.

| Aug 11, 2010

Financial Wizardry Builds a Community

At 69 square miles, Vineland is New Jersey's largest city, at least in geographic area, and it has a rich history. It was established in 1861 as a planned community (well before there were such things) by the utopian Charles Landis. It was in Vineland that Dr. Thomas Welch found a way to preserve grape juice without fermenting it, creating a wine substitute for church use (the town was dry).

| Aug 11, 2010

Integrated Project Delivery builds a brave, new BIM world

Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.

| Aug 11, 2010

Bronze Award: Alumni Gymnasium Renovation, Dartmouth College Hanover, N.H.

At a time when institutions of higher learning are spending tens of millions of dollars erecting massive, cutting-edge recreation and fitness centers, Dartmouth College in Hanover, N.H., decided to take a more modest, historical approach. Instead of building an ultra-grand new facility, the university chose to breathe new life into its landmark Alumni Gymnasium by transforming the outdated 99-y...

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021