When Dennis Fula took over responsibility for the Milwaukee Public School System’s (MPS) roof maintenance more than twenty years ago, many of the school buildings were threatened with closure due to unsafe conditions. Determined to ensure the city’s students had safe roofs over their heads, Dennis partnered with Dan Dalle Nogare and the team at Atlas Roofing Corporation to solve those safety concerns, reduce maintenance costs and extend the life of the historic school buildings.
Located throughout the city of Milwaukee and neighboring towns, MPS houses thousands of students. After years of wear and tear from the harsh Wisconsin winters, the buildings’ roofs were in terrible shape, with some in threat of condemnation. Previously, the maintenance department had used short-term fixes by adding material to leaky roofs, ultimately worsening problems throughout the entire building network. Dennis realized the school system needed a long-term solution to their roofing problems and was able to successfully recommend the implementation of the Atlas Certified Drainage Program (CDP™).
CDP is a comprehensive service for low slope tapered roofs designed to eliminate ponding water on a roof’s surface. The program’s designs help to prevent structural roof collapse, moisture invasion, membrane degradation, loss of thermal resistance, ice formation, vegetation growth and voiding system warranty. The Atlas CDP team worked on site with the MPS maintenance crew to map each roof in the school system and design custom drainage solutions specific to every individual building. While some building materials manufacturers will give a 25-year warranty, CDP ensures positive slope and drainage, which helps extend the life of the roof beyond a typical warranty. With proper maintenance and care, the MPS roofing system can last for 40 years.
By utilizing the Atlas Roofing Corporation’s Certified Drainage Program, the Milwaukee Public School System team saved on time and labor in addition to extending the life of each roof by at least 10–15 years, and in some cases more than 20. In fact, before implementing the CDP system, each school was only getting 20, 15 or as few as 10 years out of a roofing surface. Now the MPS team expects their roofs to last at least 30 years. According to the team, since implementing this system over 20 years ago, they still have yet to replace a roof with the new CDP system installed.
While maintenance is still required, the number of repairs needed is reduced each year. Before utilizing the CDP, the MPS team would find 200–400 leaks to inspect after rain and now, they are dealing with an average of only 20–30 leaks per building, of which only a fraction are leaks caused by the roof. The MPS team is incredibly proud of the program’s success and of the unprecedented support from Atlas Roofing Corporation. According to the MPS team, “You’d hardly know these roofs are 20 years old… they look good as new.”
To read the full case study, please visit http://www.atlasrwi.com/casestudies/mps/.
Related Stories
Sponsored | Roofing | Feb 11, 2015
New school blends with local architecture using Petersen metal roof
Perkins Eastman in Stamford, Conn., designed the school to emphasize and integrate the International Baccalaureate curriculum throughout.
Sponsored | Roofing | Jan 26, 2015
A revitalized solar roof for San Francisco's Davies Symphony Hall
White thermoplastic PVC roof system fits the bill for rooftop solar installation project at famed concert hall.
| Nov 17, 2014
Resolving practical problems in roofing retrofits and renovations [AIA course]
This course, worth 1.0 AIA HSW learning unit, provides expert advice on how to make a roof last as long as possible, and how to properly retrofit or reroof when the roof has run its course.
Sponsored | | Sep 2, 2014
Metal roofs offer energy-efficiency, durability, and recyclability
Metal roofing material is known for its durability, but it also offers two other sustainable attributes that are sometimes overlooked: enhanced energy-efficiency and high recyclability.
| Mar 20, 2014
Fluor defines the future 7D deliverable without losing sight of real results today
A fascinating client story by Fluor SVP Robert Prieto reminds us that sometimes it’s the simplest details that can bring about real results today—and we shouldn’t overlook them, even as we push to change the future state of project facilitation.
| Dec 10, 2013
16 great solutions for architects, engineers, and contractors
From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.
| Nov 25, 2013
Manufacturers race to offer EPDs, HPDs in response to LEED v4
Under LEED v4, projects are awarded points for using at least 20 building products that have issued Environmental Product Declarations or Health Product Declarations. In response, manufacturers are racing to offer EPDs and HPDs for their product lines.
| Oct 30, 2013
Metal roof design tips: The devil is in the details
This AIA/CES-approved presentation provides information regarding proper design to prevent possible infiltration from the roof system into the building. It also works as a guide when designing a roof to allow for proper water runoff.
| Oct 28, 2013
NRCA's EnergyWise Roof Calculator has been updated with new IECC and IgCC codes
NRCA's EnergyWise Roof Calculator Online has been updated to include information from the 2012 version of the International Code Council's International Energy Conservation Code and the 2012 version of the International Green Construction Code .
| Oct 28, 2013
Metal roofs are topping more urban dwellings
Given their durability and ease of use, metal roofs have been a common feature on rural houses for decades. Now they’re becoming an increasingly popular choice on urban dwellings as well.