flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

MiraCosta Community College to receive new Chemistry and Biotechnology Building

University Buildings

MiraCosta Community College to receive new Chemistry and Biotechnology Building

HED designed the building.


By David Malone, Associate Editor | June 28, 2021
MiraCosta Chemistry and Biotechnology Building
MiraCosta Chemistry and Biotechnology Building

MiraCosta Community College is set to receive a new HED-designed Chemistry and Biotechnology laboratory building.

Situated on the northeast quadrant of the Oceanside Campus, the $37.4 million project will include 24,000 sf of STEM instructional space that will feature new chemistry labs and 40-person, flexible classrooms. The building will provide a new, expanded home for the college’s Biotechnology Program.

The project will advance the STEM curriculum to the next level with the help of the facility’s mix of instructional, work, social, and laboratory spaces. The building will be activated through integration with the latest learning technology systems.

 

SEE ALSO: Lehigh University expands its burgeoning business college

 

The design takes advantage of the mild Oceanside climate through the incorporation of a ‘big roof’ that provides a weather-protected exterior space for gatherings and interactions. It also will serve as a transition from the building into the quad. Covered and screened porches of varying widths will activate connections to adjoining spaces and provide exterior study and meeting spaces for students.

"This facility takes a 'science on display' approach to stimulating student interest and sharing aspects of the Chemistry and Biotech programs with visitors as well. Large windows and continuous circulation routes allow easy circulation around the building without disturbing classes and labs," said Jennette La Quire, Principal and Project Leader with HED, in a release.

In addition to HED, C.W. Driver is building the project.

 

Related Stories

University Buildings | Jan 6, 2020

Making it: Gen Z learns by doing

This fundamental shift in learning style will have an impact on higher-education space planning.

University Buildings | Dec 17, 2019

Two LMN Architects-designed academic science buildings move forward for completion next year

These facilities will bring several disciplines under one roof.

University Buildings | Dec 12, 2019

HOK will design the Florida Gators new football facility

The facility will be named after longtime donor to the University of Florida and the University Athletic Association James W. “Bill” Heavener.

Wood | Dec 6, 2019

The University of Arkansas is now home to America’s largest mass timber building

A design collaborative led by Leers Weinzapfel Associates, Modus Studio, Mackey Mitchell Architects, and OLIN designed the project.

University Buildings | Nov 1, 2019

Design unveiled for the University of Maryland’s School of Public Policy building

LEO A DALY, in association with VJAA, designed the building.

University Buildings | Oct 28, 2019

Eight projects showcase the latest trends in student housing

Join us on a tour of select student residences at some of America’s top four-year colleges and universities.

University Buildings | Sep 30, 2019

UMass Amherst’s Worcester Commons to be built on an existing parking lot

Shawmut, in partnership with Perry Dean Rogers and Connor Architecture, are designing the project.

University Buildings | Sep 23, 2019

Engineering Innovation Hub completes on SUNY New Paltz campus

Urbahn Architects designed the project.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021