An 18-kilometer transit corridor running east and west across Mississauga, known as the Mississauga Bus Rapid Transit (BRT) project, will connect the city with Toronto.
The BRT will support local, express, GO Transit, and other intercity bus services for thousands of passengers on a daily basis. As such, a plethora of new stations were required. IBI Group, working as a sub-consultant to MMM Group, developed the initial conceptual design for all 12 proposed stations. The company went on to produce the construction documents for nine new stations along the grade-separated segments of the BRT corridor.
The new stations all share a common design theme, but each one has been customized to better relate to site-specific conditions and meet ancillary facilities requirements.
Each bus station shares features such as at-grade entry, pedestrian bridges, and trenched bus ways. Some of the included facilities are commuter parking, passenger drop off zones, and Bike & Ride.
G+A International helped with station branding to provide the BRT with a distinctive identity.
Courtesy of IBI Group.
Courtesy of IBI Group.
Courtesy of IBI Group.
Related Stories
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| Mar 29, 2012
U.K.’s Manchester Airport tower constructed in nine days
Time-lapse video shows construction workers on the jobsite for 222 continuous hours.
| Feb 15, 2012
Skanska secures $87M contract for subway project
The construction value of the project is $261.9 M. Skanska will include its full share, $87 M, in the bookings for Skanska USA Civil for the first quarter 2012.
| Dec 21, 2011
Hoboken Terminal restoration complete
Restoration of ferry slips, expanded service to benefit commuters.
| Dec 19, 2011
Davis Construction breaks ground on new NIAID property
The new offices will total 490,998 square feet in a 10-story building with two wings of 25,000 square feet each.
| Dec 2, 2011
What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20
Nominate a colleague, peer, or even yourself. Applications available here.
| Nov 10, 2011
Suffolk Construction awarded MBTA transit facility and streetscape project
The 21,000-sf project will feature construction of a cable-stayed pedestrian bridge over Ocean Avenue, an elevated plaza deck above Wonderland MBTA Station, a central plaza, and an at-grade pedestrian crossing over Revere Beach Boulevard