Morgan Thermal Ceramics worked with UL Underwriter’s Laboratories Inc. to certify a new installation method for grease duct enclosures used in commercial construction.
The new system, an update to the existing classification, results in a 33% space saving. To obtain UL listing for the modified installation method, the company conducted extensive fire performance testing in accordance with ASTM E 2336.
The improved installation method is part of a complete system that includes all materials and the way the materials are installed. The wrapping system uses Morgan Thermal Ceramics’ FireMaster FastWrap XL products, which are installed using compression joints at all seams on both layers of a 2-layer grease duct system. Also included is the new FireMaster FastDoor XL UL-listed access door for grease ducts, which provides a safe and easy way to gain access to kitchen ducts for cleaning and inspection.
The system can be used in commercial construction and is expected to be widely used by mechanical HVAC contractors, insulation, mechanical, and general contractors, as well as duct designers and architects.
Other enclosures on the market use a minimum of 3-inch overlaps of blankets on seams or joints. The new system’s tight butt seam joint saves on material use, because there is no need for the double material thickness for the overlap. BD+C
Related Stories
| May 7, 2012
2012 BUILDING TEAM AWARDS: Fort Belvoir Community Hospital
A new military hospital invokes evidence-based design to create a LEED-certified facility for the nation’s soldiers and their families.
| May 7, 2012
2012 BUILDING TEAM AWARDS: Audie L. Murphy VA Hospital
How a Building Team created a high-tech rehabilitation center for wounded veterans of the conflicts in Iraq and Afghanistan.
| May 3, 2012
2012 BUILDING TEAM AWARDS: Rush University Medical Center
This fully integrated Building Team opted for a multi-prime contracting strategy to keep construction going on Chicago’s Rush University Medical Center, despite the economic meltdown.
| May 3, 2012
Best commercial modular buildings and marketing programs recognized
Judges scored entries on architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete.
| May 3, 2012
Zero Energy Research Lab opens at North Texas
The living lab—the only one of its kind in Texas—is designed to test various technologies and systems in order to achieve a net-zero consumption of energy.
| May 3, 2012
NSF publishes ANSI standard evaluating the sustainability of single ply roofing membranes
New NSF Standard provides manufacturers, specifiers and building industry with verifiable, objective criteria to identify sustainable roofing products.
| May 3, 2012
Ground broken for $94 million hospital expansion at Scripps Encinitas
New facility to more than double emergency department size, boost inpatient beds by 43%.
| May 3, 2012
Rudolph and Sletten, Inc. wins CMAA award
Firm recognized for the renovation of Grossmont-Cuyamaca Community College’s Student Administrative & Griffin Student Center.
| May 2, 2012
Building Team completes two additions at UCLA
New student housing buildings are part of UCLA’s Northwest Campus Student Housing In-Fill Project.
| May 2, 2012
Sasaki selected for 2012 National Planning Firm Award
The award recognizes a firm for its body of distinguished work influencing the planning profession.