flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mukilteo Multimodal Ferry Terminal opens in Mukilteo, Wash.

Transit Facilities

Mukilteo Multimodal Ferry Terminal opens in Mukilteo, Wash.

LMN Architects designed the $187 million project.


By David Malone, Associate Editor | January 11, 2021
Mukilteo Ferry Terminal

All photos: Benjamin Benschneider

Built on a repurposed brownfield site to replace the existing Mukilteo ferry terminal, the new Mukilteo Multimodal Ferry Terminal provides more space for vehicle holding and separates pedestrian and vehicle boarding with an overhead walkway for safer, more efficient loading, especially for people with disabilities. The new facility includes a 5,865-sf terminal, a 4,193-sf maintenance building, and a 828-sf toll plaza.

The two-story building was designed in partnership with KPFF Consulting Engineers with input from local Coast Salish tribes. The building’s longhouse form streamlines circulation and manages large patron flows with intuitive wayfinding. Vertical transportation cores with elevators and stairs at each end of the structure lead to a linear promenade at the upper level, from which entries to the ticketing and waiting area are plainly visible.

 

Mukilteo Ferry Terminal interior

 

A daylight-filled waiting room provides views to land and sea and helps to orient ferry riders. Tribal cultural motifs created by local Native American artists are displayed throughout the building to create a welcoming atmosphere. A new waterfront promenade connects a path from downtown Mukilteo through the terminal and onto the beach, creating an elevated pathway for public use.

 

Mukilteo ferry terminal toll plaza

 

The team approached the project with strong sustainability ambitions. Removing the pier eliminated approximately 10% of the Puget Sound’s remaining toxic creosote piles. The longhouse-style shed roof provides space for a full array of photovoltaic panels, allowing the building to return energy to the grid. The roof canopy is made from cross-laminated timber while heating and cooling the concrete-slab main floor with electric heat pumps provides interior comfort year round. Additionally, a rack and pinion window system automatically opens and closes in response to changing conditions, optimizing airflow and comfort.

The new Mukilteo Multimodal Ferry Terminal officially opened on Dec. 29.

 

Mukilteo ferry terminal ticketing area

Related Stories

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

Transit Facilities | Feb 18, 2021

AECOM and Ferrovial to design vertiport infrastructure in Florida

The vertiports will enable eVTOL Aviation, connecting Florida’s major cities.

Transit Facilities | Feb 2, 2021

MAD Architects unveils ‘Train Station in the Forest’

The project is located in the center of Jiaxing in southeast China.

Transit Facilities | Jan 29, 2021

Virgin Hyperloop unveils its vision for the future of travel

Bjarke Ingels Group has partnered with the company to design the hyperloop portals.

Transit Facilities | Jan 5, 2021

New York’s Moynihan Train Hall opens

SOM designed the project.

Giants 400 | Dec 16, 2020

Download a PDF of all 2020 Giants 400 Rankings

This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.

Giants 400 | Aug 28, 2020

2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms

The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.

Transit Facilities | Sep 23, 2019

KAI designs bus transit center for San Antonio’s VIA Metropolitan Transit

The facility takes its design cues from World War I biplanes.

Transit Facilities | Aug 7, 2019

Video: Humphreys & Partners presents its design vision for Uber Air Skyport

In this two-minute video, Walter Hughes, Humphreys' Chief Innovation Officer, walks us through his firm's design concept for Uber's aerial ridesharing hub.

Transit Facilities | Jun 26, 2019

Virgin Trains breaks ground on Orlando passenger rail service expansion

The company is developing 170 miles of new track.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



Transit Facilities

Top 25 Transit Facility Construction Firms for 2023

The Walsh Group, Clark Group, Hensel Phelps, Skanska USA, and Hill International top BD+C's ranking of the nation's largest transit facility general contractors and construction management (CM) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes construction revenue for work related to bus terminals, rail terminals, and transit stations.


Transit Facilities

Top 40 Transit Facility Engineering Firms for 2023

AECOM, Jacobs, EXP, WSP, and Arup head BD+C's ranking of the nation's largest transit facility engineering and engineering/architecture (EA) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to bus terminals, rail terminals, and transit stations.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021