flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nauset completes addition and renovation for Winchester senior living community

Nauset completes addition and renovation for Winchester senior living community

Theater, library, fitness center, and bistro enhance facility.


By By BD+C Staff | February 8, 2012
Designed by architectural firm Levi + Wong Design Associates Inc., the 40,000 sq
Designed by architectural firm Levi + Wong Design Associates Inc., the 40,000 square foot project elevates the senior living exp

Nauset Construction recently completed construction of a significant renovation, addition and site improvements to The Gables at Winchester, an integrated independent and assisted living retirement community owned and operated by Five Star Senior Living of Newton, Mass.

Designed by architectural firm Levi + Wong Design Associates Inc., the 40,000 square foot project elevates the senior living experience by including a stadium-style theater, library, fitness center, and a bistro within the campus of the wooded location. The multi-million dollar project was completed in three phases over a fourteen-month period to minimize disruptions to the residents of The Gables.

The addition includes a theater/media room with state-of-the art movie equipment and sound system and fixed, stadium style seating. A new activity room with a grand main entrance was constructed featuring traditional architectural details with high end finishes.

Additional improvements included a new beauty salon, an exercise room outfitted with the latest in fitness equipment, an elegant dining room and beautifully landscaped outdoor patios with stone wall seats, blue stone in-lays and warm exterior lighting. The project required extensive site preparation, and included the installation of a mat foundation to accommodate the steel and wood frame construction. Concrete retaining walls were constructed and new mechanical, electrical and fire alarm systems were installed throughout the existing facility. BD+C

Related Stories

| Aug 24, 2012

Meis heads to Woods Bagot Sport

Staples Center, Paul Brown Stadium architect to leverage global studio to serve clients worldwide.

| Aug 21, 2012

Under 40 Leadership Summit slated for October 3-5 in Chicago

Attendees will be given an exclusive technical tour of Wrigley Field, led by Steven J. Jacobsen, CDP, who has been retained by the Chicago Cubs to create the business plan and high-level concepts to evaluate the feasibility of various renovation options for this iconic sports venue; and Carl Rice, Cubs’ Vice President, Baseball Operations.

| Aug 21, 2012

Hong Kong’s first LEED Platinum pre-certified building opens

Environmentally-sensitive features have been incorporated, including reduced operational CO2 emissions, and providing occupiers with more choice in creating a suitable working environment.

| Aug 21, 2012

Stellar wins four ABC Excellence In Construction awards

ABC's Excellence In Construction program is the industry’s leading award competition, recognizing outstanding construction projects in a variety of categories.

| Aug 20, 2012

Protecting the artifacts at George H.W. Bush Presidential Library and Museum

Roof leaks threatened to damage artifacts and disturb a delicately controlled indoor environment at the George H.W. Bush Presidential Library and Museum.

| Aug 17, 2012

Ferreri joins PGAL as Principal

Ferreri will be responsible for business development, contract negotiation, project design through construction and staff management/mentoring.

| Aug 17, 2012

Centric Architecture and PLAD Studio merge

The new firm will retain Centric Architecture as its name.

| Aug 15, 2012

MBH Architects announces new appointments

MBH Architects continues to grow, take on new clients.

| Aug 15, 2012

Architects and designers challenged in Allsteel’s reality design competition

KITS mobile app offers flexibility in planning.

| Aug 14, 2012

Leo A Daly welcomes Carl Gentilcore

Gentilcore will be responsible for identifying, developing and managing client relations with key federal government agencies.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021