Nauset Construction recently completed construction of a significant renovation, addition and site improvements to The Gables at Winchester, an integrated independent and assisted living retirement community owned and operated by Five Star Senior Living of Newton, Mass.
Designed by architectural firm Levi + Wong Design Associates Inc., the 40,000 square foot project elevates the senior living experience by including a stadium-style theater, library, fitness center, and a bistro within the campus of the wooded location. The multi-million dollar project was completed in three phases over a fourteen-month period to minimize disruptions to the residents of The Gables.
The addition includes a theater/media room with state-of-the art movie equipment and sound system and fixed, stadium style seating. A new activity room with a grand main entrance was constructed featuring traditional architectural details with high end finishes.
Additional improvements included a new beauty salon, an exercise room outfitted with the latest in fitness equipment, an elegant dining room and beautifully landscaped outdoor patios with stone wall seats, blue stone in-lays and warm exterior lighting. The project required extensive site preparation, and included the installation of a mat foundation to accommodate the steel and wood frame construction. Concrete retaining walls were constructed and new mechanical, electrical and fire alarm systems were installed throughout the existing facility. BD+C
Related Stories
| May 14, 2012
ArchiCAD e-Specs integration unveiled
Architects, engineers and construction professionals use InterSpec’s e-SPECS products on thousands of projects annually to maintain synchronization between construction models, drawings, and project specifications.
| May 11, 2012
2012 White Paper: High-Performance Reconstructed Buildings: The 99% Solution
Download the complete White Paper, Chapters 1-10
| May 11, 2012
Chapter 10 Action Plan: 18 Recommendations for Advancing Sustainability in Reconstructed Buildings
We offer the following recommendations in the hope that they will help step up the pace of high-performance building reconstruction in the U.S. and Canada. We consulted many experts for advice, but these recommendations are solely the responsibility of the editors of Building Design+Construction. We welcome your comments. Please send them to Robert Cassidy, Editorial Director: rcassidy@sgcmail.com.
| May 11, 2012
Chapter 9 The Key to Commissioning That Works? It Never Stops
Why commissioning for existing and renovated buildings needs to be continuous to be effective.
| May 11, 2012
Chapter 8 High-Performance Reconstruction and Historic Preservation: Conflict and Opportunity
What historic preservationists and energy-performance advocates can learn from each other.
| May 11, 2012
VFA to acquire Altus Group's Capital Planning division
Strategic move strengthens VFA's facilities capital planning market osition in North America.
| May 11, 2012
Betz promoted to senior vice president for McCarthy’s San Diego Office
He will oversee client relations, estimating, office operations and personnel as well as integration of the company’s scheduling, safety and contracts departments.
| May 11, 2012
CRSI appoints Brace chairman
Stevens also elected to board of directors and vice-chair.
| May 11, 2012
Dempster named to AIA College of Fellows
Altoon Partners’ technical and construction services leader honored for his contributions.
| May 11, 2012
AIA launches education and training portal
New portal to host Contract Documents training, education resources in one convenient place.