flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nauset completes addition and renovation for Winchester senior living community

Nauset completes addition and renovation for Winchester senior living community

Theater, library, fitness center, and bistro enhance facility.


By By BD+C Staff | February 8, 2012
Designed by architectural firm Levi + Wong Design Associates Inc., the 40,000 sq
Designed by architectural firm Levi + Wong Design Associates Inc., the 40,000 square foot project elevates the senior living exp

Nauset Construction recently completed construction of a significant renovation, addition and site improvements to The Gables at Winchester, an integrated independent and assisted living retirement community owned and operated by Five Star Senior Living of Newton, Mass.

Designed by architectural firm Levi + Wong Design Associates Inc., the 40,000 square foot project elevates the senior living experience by including a stadium-style theater, library, fitness center, and a bistro within the campus of the wooded location. The multi-million dollar project was completed in three phases over a fourteen-month period to minimize disruptions to the residents of The Gables.

The addition includes a theater/media room with state-of-the art movie equipment and sound system and fixed, stadium style seating. A new activity room with a grand main entrance was constructed featuring traditional architectural details with high end finishes.

Additional improvements included a new beauty salon, an exercise room outfitted with the latest in fitness equipment, an elegant dining room and beautifully landscaped outdoor patios with stone wall seats, blue stone in-lays and warm exterior lighting. The project required extensive site preparation, and included the installation of a mat foundation to accommodate the steel and wood frame construction. Concrete retaining walls were constructed and new mechanical, electrical and fire alarm systems were installed throughout the existing facility. BD+C

Related Stories

| Apr 25, 2012

Bubble skyscraper design aims to purify drinking water

The Freshwater Skyscraper will address the issue of increasing water scarcity through a process known as transpiration

| Apr 25, 2012

Thornton Tomasetti/Fore Solutions provides consulting for Biologics Support Center

Project receives LEED Gold Certification.

| Apr 25, 2012

McCarthy introduces high school students to a career in construction

High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.

| Apr 25, 2012

Missner Group names McCrory VP of property management

McCrory will be responsible for overseeing the financial and operational needs of the firm’s commercial real estate portfolio which includes more than two million square feet of property.

| Apr 25, 2012

Rogers joins Morgan/Harbour as senior project manager

Rogers will also manage the construction process and daily activities as well as act as the interface between the subcontractors, owners, municipalities and regulatory agencies

| Apr 25, 2012

J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University

The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.

| Apr 24, 2012

ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014

Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.

| Apr 24, 2012

Roofing Supply Group acquired by Clayton, Dubilier & Rice

RSG provides a complete offering of residential and commercial roofing materials and related supplies.

| Apr 24, 2012

McLennan named Ashoka Fellow

McLennan was recognized for his work on the Living Building Challenge.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021