Nauset Construction recently completed construction of a significant renovation, addition and site improvements to The Gables at Winchester, an integrated independent and assisted living retirement community owned and operated by Five Star Senior Living of Newton, Mass.
Designed by architectural firm Levi + Wong Design Associates Inc., the 40,000 square foot project elevates the senior living experience by including a stadium-style theater, library, fitness center, and a bistro within the campus of the wooded location. The multi-million dollar project was completed in three phases over a fourteen-month period to minimize disruptions to the residents of The Gables.
The addition includes a theater/media room with state-of-the art movie equipment and sound system and fixed, stadium style seating. A new activity room with a grand main entrance was constructed featuring traditional architectural details with high end finishes.
Additional improvements included a new beauty salon, an exercise room outfitted with the latest in fitness equipment, an elegant dining room and beautifully landscaped outdoor patios with stone wall seats, blue stone in-lays and warm exterior lighting. The project required extensive site preparation, and included the installation of a mat foundation to accommodate the steel and wood frame construction. Concrete retaining walls were constructed and new mechanical, electrical and fire alarm systems were installed throughout the existing facility. BD+C
Related Stories
| Oct 11, 2011
ThyssenKrupp elevator cabs validated by UL Environment
The conclusive and independent third-party validation process is another step toward a green product line.
| Oct 11, 2011
Ballard Spahr launches real estate recovery group
The new group represents an expansion of the company’s Distressed Real Estate Initiative, which was launched in 2008 to help clients throughout the country plan, adapt and prosper in a challenging economic environment.
| Oct 11, 2011
Onex completes investment in JELD-WEN
With the completion of the JELD-WEN investment, Onex Partners III is approximately 40% invested.
| Oct 7, 2011
GREENBUILD 2011: Demand response partnership program announced at Greenbuild 2011
Program will use USGBC’s newly revised LEED Demand Response credit as an implementation guideline and leverage its relationships with the building community to foster adoption and participation in existing utility and solution provider demand response offerings.
| Oct 7, 2011
GREENBUILD 2011: Otis Elevator announces new contracts for sustainable building projects
Wins reinforce Otis’ position as leader in energy-efficient products.
| Oct 7, 2011
GREENBUILD 2011: UL Environment releases industry-wide sustainability requirements for doors
ASSA ABLOY Trio-E door is the first to be certified to these sustainability requirements.
| Oct 7, 2011
GREENBUILD 2011: UL Environment clarifies emerging environmental product declaration field
White paper defines EPD, details development process, and identifies emerging trends for manufacturers, architects, designers, and buyers.
| Oct 7, 2011
GREENBUILD 2011: Otis Elevator introduces energy-efficient escalator
The energy-efficient NCE escalator from Otis offers customers substantial “green” benefits.
| Oct 7, 2011
GREENBUILD 2011: Schools program receives grant to track student conservation results
To track results, schools will use the newly developed Sustainability Dashboard, a unique web-based service that makes tracking sustainability initiatives affordable and easy.
| Oct 7, 2011
GREENBUILD 2011: Transparent concrete makes its North American debut at Greenbuild
The panels allow interior lights to filter through, from inside.