As recently as the early-1990s, NBA teams would practice at local college gyms. Just imagine, high-profile, multimillion dollar athletes working on their post-up games and pick-and-roll defense on the creaky floors and shaky backboards at Northwest Backwater U.
Eventually teams got their own practice facilities, and now teams are building state-of-the-art complexes filled with practice courts, locker rooms, fitness centers, hydrotherapy pools, dining halls, and medical and training rooms.
Everything is top-of-the-line, too. Teams want to make sure their players are happy, rested, and physically fit. Teams also use the facilities as a way to lure free agents, to make their team a place where the league’s best players want to play.
The Atlanta Hawks are shaping up to become one of those teams. The Hawks and Emory Healthcare and partnering to build a 90,000-sf training and sports medicine center in Brookhaven, Ga.
The building, designed by HOK, will be the NBA’s first practice facility to be located within a sports medicine center. The arrangement allows for immediate treatment and on-site access to advanced medical technology, like the 3 Tesla MRI, a body scanner that can detect injuries from bruises to torn ligaments. Emory will use 30,000 sf of the building for sports training and preventive and rehabilitative treatment.
The facility will also have equipment for 3D motion capture, cryotherapy, sensory deprivation, and in-ground hydrotherapy. Hawks players will receive training services from sports science company P3.
“By blending research, sports medicine, healthcare and training into one building, the Atlanta Hawks and Emory Healthcare will change the way the industry approaches athletic training and injury prevention,” George Heinlein, a Regional Rirector of HOK’s Sports + Recreation + Entertainment practice, said in a statement. “We have brought together HOK’s multidisciplinary leaders in healthcare, science and technology, and sports facility design to elevate the training experience and create a new model for professional and collegiate athletics.”
Construction will begin this summer, and the building will open in the fall of 2017, before the NBA season begins. The privately-funded center will cost roughly $50 million.
The Hawks currently practice in an auxiliary gym at their home at Philips Arena.
Related Stories
| Oct 30, 2014
New hotel to be developed at future Dallas Cowboys World Headquarters
The Omni property will be one of the only full-service upscale hotels in the area, and serve as a cornerstone of the mixed-use development, which will be anchored by the Dallas Cowboys World Headquarters and Frisco’s Multi-Use Event Center.
| Oct 20, 2014
Singapore Sports Hub claims world's largest free-spanning dome
The retractable roof, which measures a whopping 1,017-feet across, is made from translucent ETFE plastic panels supported with metal rigging that arches over the main pitch.
| Oct 16, 2014
Perkins+Will white paper examines alternatives to flame retardant building materials
The white paper includes a list of 193 flame retardants, including 29 discovered in building and household products, 50 found in the indoor environment, and 33 in human blood, milk, and tissues.
| Oct 15, 2014
Harvard launches ‘design-centric’ center for green buildings and cities
The impetus behind Harvard's Center for Green Buildings and Cities is what the design school’s dean, Mohsen Mostafavi, describes as a “rapidly urbanizing global economy,” in which cities are building new structures “on a massive scale.”
| Oct 12, 2014
AIA 2030 commitment: Five years on, are we any closer to net-zero?
This year marks the fifth anniversary of the American Institute of Architects’ effort to have architecture firms voluntarily pledge net-zero energy design for all their buildings by 2030.
| Sep 24, 2014
Architecture billings see continued strength, led by institutional sector
On the heels of recording its strongest pace of growth since 2007, there continues to be an increasing level of demand for design services signaled in the latest Architecture Billings Index.
| Sep 22, 2014
4 keys to effective post-occupancy evaluations
Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.
| Sep 22, 2014
Sound selections: 12 great choices for ceilings and acoustical walls
From metal mesh panels to concealed-suspension ceilings, here's our roundup of the latest acoustical ceiling and wall products.
| Sep 17, 2014
Atlanta Braves break ground on mixed-use ballpark development
SunTrust Park will be constructed by American Builders 2017, a joint venture between Brasfield & Gorrie, Mortenson Construction, Barton Malow Company, and New South Construction.
| Sep 9, 2014
Using Facebook to transform workplace design
As part of our ongoing studies of how building design influences human behavior in today’s social media-driven world, HOK’s workplace strategists had an idea: Leverage the power of social media to collect data about how people feel about their workplaces and the type of spaces they need to succeed.