flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NBCU News Group unveils new Washington bureau and studios

Office Buildings

NBCU News Group unveils new Washington bureau and studios

The project spans six floors and 80,000 sf.


By David Malone, Associate Editor | February 3, 2021
NBCU bureau and studios
NBCU bureau and studios

On Jan. 24, NBCU News Group debuted its new Washington bureau and studios.

The bureau spans six floors and 80,000 sf and includes seven studios. The spacious studios and modern workspaces will be the headquarters for more than 400 NBCU News Group employees including the networks’ White House, Capitol Hill and political units; the investigative, national security, Pentagon, Justice Department, foreign affairs, and transportation reporting teams; the network’s Washington-based NBC News Digital operations; and producers for TODAY, NBC Nightly News and MSNBC.

Inspired by the neoclassical and federal-style architecture found in Washington, D.C. and neighboring Union Station, the new Washington Bureau features 14-foot-high ceilings, modern lighting, contemporary finishes, and state-of-the-art technology, such as 650 sf of tracking LED walls.

The main first floor studio is circled with ten-foot floor-to-ceiling windows, which allow the public to see and experience news production live and in person. Exterior-facing LED screens showcase live programming while news-tickers flank the buildings facade.

The build team includes architectural firms Lawson, Meridian, and Gensler, DPR as the primary construction contractor, The Lighting Design Group handled lighting design.

 

NBCU bureau and studios

Related Stories

| Dec 9, 2011

BEST AEC FIRMS 2011: EYP Architecture & Engineering

Expertise-Driven Design: At EYP Architecture & Engineering, growing the business goes hand in hand with growing the firm’s people.

| Dec 8, 2011

HDR opens office in Shanghai

The office, located in the Chong Hing Finance Center in Shanghai’s busy Huangpu District, will support HDR’s design efforts throughout Asia. 

| Dec 8, 2011

HOK elevates the green office standard

Firm achieves LEED Platinum certification in New York office that overlooks Bryant Park.

| Dec 6, 2011

?ThyssenKrupp acquires Sterling Elevators Services

The acquisition of Sterling Elevator Services Corporation is the third acquisition completed by ThyssenKrupp Elevator AG in the last three months in North America. 

| Dec 6, 2011

New office building features largest solar panel system in New Orleans

Woodward Design+Build celebrates grand opening of new green headquarters in Central City.

| Dec 5, 2011

Gables Residential brings mixed-use building to Houston's Tanglewood area

The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.

| Dec 5, 2011

SchenkelShultz Architecture designs Dr. Phillips Charities Headquarters building in Orlando

The building incorporates sustainable architectural features, environmentally friendly building products, energy-efficient systems, and environmentally-sensitive construction practices.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Dec 1, 2011

VLK Architects’ office receives LEED certification

The West 7th development, which houses the firm’s office, was designed to be LEED for Core & Shell, which gave VLK the head start on finishing out the area for LEED Silver Certification CI.

| Nov 22, 2011

Corporate America adopting revolutionary technology

The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector. 

boombox1
boombox2
native1

More In Category



Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


MFPRO+ News

San Francisco unveils guidelines to streamline office-to-residential conversions

The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021