flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NC State University’s transparent engineering building has ‘engineering on display’ around every corner

University Buildings

NC State University’s transparent engineering building has ‘engineering on display’ around every corner

Clark Nexsen designed the new building.


By David Malone, Associate Editor | May 22, 2018
Fitts-Woolard Hall exterior

Courtesy Clark Nexsen

NC State University has officially broken ground on Fitts-Woolard Hall, a new $150 million engineering building on Centennial Campus. The 250,000-sf facility was designed by Clark Nexsen and will feature a transparent design that puts “engineering on display.”

The building’s main entry is flanked by a structural testing lab, senior student project space, and a large scale driving simulator that are all visible on the exterior and interior of the building.

 

Fitts Woodlard HallCourtesy Clark Nexsen.

 

Collaboration and interaction will be supported throughout the four-story building in high degrees of transparency. Stairs at the end of the building will act as connecting threads between floors and reveal the building’s structural and mechanical systems as an additional instructional tool. An outdoor terrace, interspersed seating, and an open, collaborative space on the second floor known as “the hearth” will promote socialization and interaction between students.

 

See Also: South Dakota State University to receive new apartment and townhouse neighborhood

 

The third and fourth floors, which will be contained in a floating volume, will house faculty offices, graduate student space, and additional classrooms and research labs. Overall, Fitts-Woolard Hall will contain over 100 classrooms and laboratories and house the Department of Civil, Construction and Environmental Engineering and the Fitts Department of Industrial and System Engineering.

Skanska is the project’s general contractor.

 

Related Stories

Laboratories | Jul 24, 2020

Customized labs give universities a recruiting edge

CO Architects is among a handful of firms that caters to this trend.

University Buildings | Jul 14, 2020

Cornell College partners with Johnson Controls to improve campus energy efficiency

The plan will reduce the college’s energy usage by 20%.

University Buildings | Jun 3, 2020

Renovation can turn older university buildings into high-performing labs

David Miller of BSALifeStructures offers technical advice on renovation of college and university laboratories and scientific research facilities.

University Buildings | Jun 2, 2020

COVID-19 and teaching the next generation of nurses

COVID-19 hasn’t just upended healthcare delivery, the workplace, and all levels of education – the economic toll is still being realized – and capital projects on college and university campuses will inevitably be impacted as public and privately funded projects adjust to the budget crunch.

University Buildings | May 20, 2020

JCJ Architecture, Moody Nolan complete UCONN's Student Recreation Center

The project sits at the center of the Storrs campus.  

University Buildings | Apr 29, 2020

Dixie State University's new Human Performance Center

Hastings+Chivetta designed the project.

Coronavirus | Apr 10, 2020

COVID-19: Converting existing hospitals, hotels, convention centers, and other alternate care sites for coronavirus patients

COVID-19: Converting existing unused or underused hospitals, hotels, convention centers, and other alternate care sites for coronavirus patients 

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021