flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NC State University’s transparent engineering building has ‘engineering on display’ around every corner

University Buildings

NC State University’s transparent engineering building has ‘engineering on display’ around every corner

Clark Nexsen designed the new building.


By David Malone, Associate Editor | May 22, 2018
Fitts-Woolard Hall exterior

Courtesy Clark Nexsen

NC State University has officially broken ground on Fitts-Woolard Hall, a new $150 million engineering building on Centennial Campus. The 250,000-sf facility was designed by Clark Nexsen and will feature a transparent design that puts “engineering on display.”

The building’s main entry is flanked by a structural testing lab, senior student project space, and a large scale driving simulator that are all visible on the exterior and interior of the building.

 

Fitts Woodlard HallCourtesy Clark Nexsen.

 

Collaboration and interaction will be supported throughout the four-story building in high degrees of transparency. Stairs at the end of the building will act as connecting threads between floors and reveal the building’s structural and mechanical systems as an additional instructional tool. An outdoor terrace, interspersed seating, and an open, collaborative space on the second floor known as “the hearth” will promote socialization and interaction between students.

 

See Also: South Dakota State University to receive new apartment and townhouse neighborhood

 

The third and fourth floors, which will be contained in a floating volume, will house faculty offices, graduate student space, and additional classrooms and research labs. Overall, Fitts-Woolard Hall will contain over 100 classrooms and laboratories and house the Department of Civil, Construction and Environmental Engineering and the Fitts Department of Industrial and System Engineering.

Skanska is the project’s general contractor.

 

Related Stories

| Aug 7, 2012

Shedding light on the arts

Renovating Pietro Belluschi’s Juilliard School opens the once-cloistered institution to its Upper West Side community.

| Aug 7, 2012

McCarthy tops out LEED Platinum-designed UCSD Health Sciences Biomedical Research Facility

New laboratory will enable UCSD to recruit and accommodate preeminent faculty.

| Jul 25, 2012

KBE Building renovates UConn dining hall

Construction for McMahon Dining Hall will be completed in September 2012.

| Jul 24, 2012

Military Housing firm announces expansion into student housing

The company has partnered with the military to build, renovate and manage nearly 21,000 homes with more than 65,000 bedrooms, situated on more than 10,000 acres of land nationwide.

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jul 20, 2012

Higher education market holding steady

But Giants 300 University AEC Firms aren’t expecting a flood of new work.

| Jul 16, 2012

Business school goes for maximum vision, transparency, and safety with fire rated glass

Architects were able to create a 2-hour exit enclosure/stairwell that provided vision and maximum fire safety using fire rated glazing that seamlessly matched the look of other non-rated glazing systems.

| Jul 11, 2012

Perkins+Will designs new home for Gateway Community College

Largest one-time funded Connecticut state project and first designed to be LEED Gold.

| Jul 9, 2012

Integrated Design Group completes UCSB data center

Firm uses European standard of power at USCB North Hall Research Data Center.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021