NC State University has officially broken ground on Fitts-Woolard Hall, a new $150 million engineering building on Centennial Campus. The 250,000-sf facility was designed by Clark Nexsen and will feature a transparent design that puts “engineering on display.”
The building’s main entry is flanked by a structural testing lab, senior student project space, and a large scale driving simulator that are all visible on the exterior and interior of the building.
Courtesy Clark Nexsen.
Collaboration and interaction will be supported throughout the four-story building in high degrees of transparency. Stairs at the end of the building will act as connecting threads between floors and reveal the building’s structural and mechanical systems as an additional instructional tool. An outdoor terrace, interspersed seating, and an open, collaborative space on the second floor known as “the hearth” will promote socialization and interaction between students.
See Also: South Dakota State University to receive new apartment and townhouse neighborhood
The third and fourth floors, which will be contained in a floating volume, will house faculty offices, graduate student space, and additional classrooms and research labs. Overall, Fitts-Woolard Hall will contain over 100 classrooms and laboratories and house the Department of Civil, Construction and Environmental Engineering and the Fitts Department of Industrial and System Engineering.
Skanska is the project’s general contractor.
Related Stories
| Dec 19, 2011
HGA renovates Rowing Center at Cornell University
Renovation provides state-of-the-art waterfront facility.
| Dec 16, 2011
Goody Clancy-designed Informatics Building dedicated at Northern Kentucky University
The sustainable building solution, built for approximately $255-sf, features innovative materials and intelligent building systems that align with the mission of integration and collaboration.
| Dec 5, 2011
Fraser Brown MacKenna wins Green Gown Award
Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.
| Dec 2, 2011
Goody Clancy awarded Ohio State residential project
The project, which is focused on developing a vibrant on-campus community of learning for OSU undergraduates.
| Nov 23, 2011
Griffin Electric completes Gwinnett Tech project
Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.
| Nov 18, 2011
Centre for Interactive Research on Sustainability opens
Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.
| Nov 11, 2011
Streamline Design-build with BIM
How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.
| Nov 11, 2011
AIA: Engineered Brick + Masonry for Commercial Buildings
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Nov 4, 2011
Two Thornton Tomasetti projects win NCSEA’s 2011 Excellence in Structural Engineering Awards
Altra Sede Regione Lombardia and Bank of Oklahoma Center both recognized.