flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

N.C.’s Outer Banks’ communities struggle for ways to keep the sea from overrunning them

Codes and Standards

N.C.’s Outer Banks’ communities struggle for ways to keep the sea from overrunning them

Tax hikes for beach replenishment offer temporary solution.


By Peter Fabris, Contributing Editor | March 25, 2021

Courtesy Pixabay

Communities along North Carolina’s Outer Banks are grappling with how to prevent beaches, and ultimately the settlements themselves, from washing away.

One solution, beach replenishment in which sand is harvested offshore and pumped onto eastern-facing beachfronts, is a costly, temporary measure. The Town of Avon, with a few hundred full-time residents, needs at least $11 million to stop its main road from washing away.

To raise the funds, Dare County proposed increasing Avon’s property taxes by almost 50% for some residents. But that plan would only stave off the problem for about five years. Other communities along the Outer Banks face similar challenges.

In light of major storms that have pummeled the sandbar island chain in recent years, along with rising sea levels, some suggest the government would be better served to pay residents to relocate inland. One Avon resident quoted in a New York Times Magazine article said he is telling his children to leave the community.

Related Stories

Codes and Standards | Aug 12, 2021

AGC pushes for more environmentally friendly construction

Contractor trade group supports government investment, tax incentives to reduce carbon footprints.

Codes and Standards | Aug 11, 2021

Decentralized approach to codes means emissions reduction responsibility falls on local officials

Efficiency advocates focusing more on local code amendments.

Digital Twin | Aug 9, 2021

Digital Twin Maturity white paper offers guidance on digital twin adoption

Provides lifecycle map and an approach for incorporating digital twins.

Codes and Standards | Aug 5, 2021

Contractors can be liable for building failures many years after project completion

Personal injury suits could be brought decades after substantial completion.

Codes and Standards | Aug 4, 2021

Mass timber is a natural choice for building recycling through deconstruction

Designing wood buildings to optimize recovery of materials for disassembly aids carbon sequestration.

Codes and Standards | Aug 3, 2021

Dept. of Energy releases initial version of the Spawn of EnergyPlus software

Targets new use cases in advanced controls, district systems, and grid integration.

Codes and Standards | Aug 2, 2021

Several U.S. cities among most expensive places to build in the world

San Francisco, New York, and Boston head the domestic list.

Codes and Standards | Jul 28, 2021

American Concrete Institute creates new director of innovative concrete technology post

Aim is to attract emerging technologies for development.

Codes and Standards | Jul 28, 2021

Higher ed faces infrastructure backlog of $112.3 billion

Study recommends integrated strategic planning for best results.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021