The Nevada Senate approved a bill that would suspend prevailing wage rules on school projects.
The prevailing wage measure is attached to a bill providing more money for school construction that has widespread support. But the 11-9 vote went according to party lines with Democrats opposed.
Prevailing wage rates are set by the state labor commissioner, and vary by the type of work and by county. Republican leadership argued that prevailing wage rules raise the price of building schools and reduce the amount of work that can be done. Under the current prevailing wage law, a journeyman carpenter on a public works project in the county encompassing Las Vegas must be paid $53.76 an hour, according to the Las Vegas Sun.
Union leaders say suspending the rules would devastate wages for middle-class workers and benefit out-of-state contractors. Democratic leaders asserted that repealing the prevailing wage provision would lead to lesser quality workmanship on school projects.
The bill now goes to the Republican-controlled Assembly.
Related Stories
Codes and Standards | May 29, 2018
Government support helping to drive demand for green building materials
Market projects to grow 12.5% annually between 2013 and 2019.
Codes and Standards | May 24, 2018
‘Amazon tax’ could slow Seattle’s construction boom
City imposes employer head count tax to fund affordable housing.
Codes and Standards | May 23, 2018
AAMA releases 2017/2018 fenestration market studies
Offers forecasts of industry trends.
Codes and Standards | May 22, 2018
Registration open for 2018 National Energy Codes Conference
U.S. Department of Energy event to be held July 15th-17th in Austin.
Codes and Standards | May 21, 2018
New standard tests quietness of floors
ASTM International method will help manufacturers test their flooring materials.
Codes and Standards | May 17, 2018
California will require solar panels on most new homes
Projected to add $10,000 to cost of new homes.
Codes and Standards | May 16, 2018
New resources offer tips on off-site construction
NIBS documents address using pre-cast concrete, and commercial and legal considerations of modular construction.
Codes and Standards | May 15, 2018
Blast testing of loaded mass timber structures yields positive results
Four tests covered a spectrum of blast loads.
Codes and Standards | May 14, 2018
Maryland makes general contractors liable for failure of subs to pay employees
GCs could have to pay for up to three times the wages owed.
Codes and Standards | May 10, 2018
Data collection, machine learning boost building efficiency
Sensors, software algorithms squeeze out waste.