Design Criteria for Ceramic Tile/Stone Installations provides an overview of the key design elements that are required for a successful ceramic tile/stone installation, including a discussion of the importance of properly designed crack isolation, waterproofing, and sound control membranes.
Upon completing this course, you will be able to:
- Discuss the critical design elements relating to ceramic tile/stone installations that should be considered during the design and specification phases
- Explain the importance of properly designed movement joints in reducing flooring failure
- State the various construction methods and materials used to facilitate a successful ceramic tile/stone installation, and
- Explain how the features and characteristics of CPE (Chlorinated Polyethylene) composite sheet membranes in a flooring assembly contribute to the prevention of building movement failures.
Everyone that successfully completed to course will receive 1.0 HSW/LU AIA LU.
Click here to take the course. +
Related Stories
| Nov 17, 2011
Hollister Construction Services renovating bank in Union City, N.J.
Project is part of a series of ground-up construction and renovation assignments.
| Nov 16, 2011
Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.
This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.
| Nov 16, 2011
Architecture Billings Index moves upward
The Architecture Billings Index climbed nearly three points in October.
| Nov 16, 2011
CRSI recommends return to inch-pound markings
The intention of this resolution is for all new rollings of reinforcing steel products to be marked with inch-pound bar markings no later than January 1st, 2014.
| Nov 16, 2011
John Patelski joins Ghafari as executive vice president
As executive vice president, Patelski will be responsible for expanding the firm’s services in new strategic markets.
| Nov 15, 2011
Struggling economy demands construction industry embrace enterprise-wide risk management
In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.
| Nov 15, 2011
Suffolk Construction breaks ground on the Victor housing development in Boston
Project team to manage construction of $92 million, 377,000 square-foot residential tower.
| Nov 15, 2011
Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa
Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.
| Nov 14, 2011
Summit Design+Build selected at GC for new Office Concepts headquarters
The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout.