flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Bjarke Ingels documentary gives a peek behind the curtain

Architects

New Bjarke Ingels documentary gives a peek behind the curtain

The movie takes a slightly darker tone than previous projects chronicling the starchitect’s rise to prominence.


By David Malone, Associate Editor | April 10, 2017

Not long after Bjarke Ingels was the focus of an episode of the Netflix design series Abstract: The Art of Design, architecture’s golden child will once again find himself at the center of another documentary, this one titled Big Time.

The recently released trailer for the movie starts as you might expect, lighthearted and bright with a healthy smattering of inspiring quotes tailor-made for bedroom-wall posters, but the tone quickly changes.

“I got a concussion,” Ingels says, “and since then, I’ve had more or less of a constant headache.” The remaining half of the trailer takes on a more hectic, stressful, and dramatic tone; images of Ingels exhaustedly-staring off into the distance, climbing into an MRI machine, and anxiously sitting in project meetings paint an image of the architect not often seen.

The trailer ends with a quote that sums up Ingels’ dedication and need for his work. “If this is where I suddenly become unable to contribute meaningfully, you almost could just lie down and wait for everything to be over,” he says.

The documentary is an official selection of the Copenhagen Architecture Festival and will screen during the festival on May 3rd.

You can view the trailer below.

 

Related Stories

| May 8, 2013

NBBJ appoints Tim Leberecht Chief Marketing Officer

NBBJ, a global architecture and design firm, today announced that it has appointed Tim Leberecht as its Chief Marketing Officer. Leberecht joins NBBJ from Frog Design where he led the marketing organization from 2006 to 2013 and helped transform the company into one of the world’s foremost design and innovation consultancies.

| May 7, 2013

First look: Golden State Warriors stadium by Snøhetta, AECOM

Architects Snøhetta and AECOM have revealed their latest renderings of a new stadium for NBA basketball team the Golden State Warriors on the waterfront in San Francisco. 

| May 7, 2013

Renovated bridge building will anchor Nashville riverfront master plan

Renovations to the former Nashville Bridge Company building were recently completed, including a newly-built modern wing. The facility has been re-dubbed The Bridge Building and now offers spaces for meetings, parties, weddings, and other events.

| May 7, 2013

First look: Adrian Smith + Gordon Gill skyscraper designed to 'confuse the wind'

The 400-meter-high, 116-story Imperial Tower in Mumbai will feature a slender, rounded form optimized to withstand the area's strong wind currents.

| May 6, 2013

SAFTI FIRST announces 3D Autodesk Revit models for fire rated wall, window, and door systems

SAFTI FIRST, leading USA-manufacturer of fire rated glass and faming systems, is proud to announce that Autodesk Revit models are now available for its fire rated walls, window and door systems via www.safti.com and Autodesk Seek.

| May 6, 2013

7 major multifamily residential projects in the works

A $140 million redevelopment of a landmark, 45-building apartment complex in Los Angeles is among the nation's significant multifamily developments under way.

| May 3, 2013

5 common failures in paints and coatings

As experienced designers, contractors, and owners know, most paint and coating problems are correctable, but some are especially stubborn to address. Here is a partial compendium of typical failure modes and methods for addressing the problem.

| May 3, 2013

'LEED for all GSA buildings,' says GSA Green Building Advisory Committee

The Green Building Advisory Committee established by the General Services Administration, officially recommended to GSA that the LEED green building certification system be used for all GSA buildings as the best measure of building efficiency.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021