Not long after Bjarke Ingels was the focus of an episode of the Netflix design series Abstract: The Art of Design, architecture’s golden child will once again find himself at the center of another documentary, this one titled Big Time.
The recently released trailer for the movie starts as you might expect, lighthearted and bright with a healthy smattering of inspiring quotes tailor-made for bedroom-wall posters, but the tone quickly changes.
“I got a concussion,” Ingels says, “and since then, I’ve had more or less of a constant headache.” The remaining half of the trailer takes on a more hectic, stressful, and dramatic tone; images of Ingels exhaustedly-staring off into the distance, climbing into an MRI machine, and anxiously sitting in project meetings paint an image of the architect not often seen.
The trailer ends with a quote that sums up Ingels’ dedication and need for his work. “If this is where I suddenly become unable to contribute meaningfully, you almost could just lie down and wait for everything to be over,” he says.
The documentary is an official selection of the Copenhagen Architecture Festival and will screen during the festival on May 3rd.
You can view the trailer below.
Related Stories
| Nov 22, 2011
New Green Matters Conference examines emerging issues in concrete and sustainability
High-interest topics will be covered in technical seminars, including infrared reflective coatings for heat island mitigation, innovative uses of concrete to provide cooling and stormwater management, environmental benefits of polished concrete, and advancements in functional resilience of architectural concrete.
| Nov 22, 2011
Suffolk Construction selected as contractor for Boston luxury residential tower
Project team breaks ground on 488,000-sf building that will feature world-class amenities.
| Nov 22, 2011
Jones Lang LaSalle completes construction of two new stores in Manhattan
Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.
| Nov 21, 2011
Mortenson and enXco partnership to build its 19th wind project
The 8,500 acres project will generate140 megawatts of wind power – enough energy to power approximately 39,000 homes.
| Nov 21, 2011
FDH Engineering acquires Energy Solutions
All ESI employees have been merged into FDH’s staff at its St. Louis office.
| Nov 18, 2011
Centre for Interactive Research on Sustainability opens
Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.
| Nov 17, 2011
SmithGroup changes name to SmithGroupJJR
SmithGroup and JJR join brands to become a single, multi-disciplinary company.
| Nov 17, 2011
Campus-wide energy-efficiency program aims to deliver $3.5 million in energy and operational savings
Merced College and Honeywell will use the school’s energy usage statistics to develop a course curriculum on sustainability, and raise awareness among students of the positive impact conservation practices contribute to the community.