flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Blinn College Residence Hall hopes to decrease the size of the campus housing wait list

University Buildings

New Blinn College Residence Hall hopes to decrease the size of the campus housing wait list

In 2016, more than 400 students were placed on the wait list due to lack of available on-campus housing.


By David Malone, Associate Editor | September 15, 2017
A rendering of the front of the new Blinn College residence hall

Rendering courtesy of Servitas.

Scheduled for completion for student move-in by fall 2018, a new four-story residence hall at Blinn College has recently broken ground in Brenham, Texas. In 2016, over 400 Blinn College students were put on the campus housing wait list. The new residence hall will help alleviate the stress on the school’s campus housing system.

The facility, located at the corner of Seager Street and Old Mill Road, will offer 464 suite-style beds and 9,000-sf of common space. Study spaces, an outdoor courtyard, and a large engineering classroom will all be included.

 

A rendering that shows the materials to be used for the Blinn College residence hallRendering courtesy of Servitas.

 

Each of the suite-style units will have their own bathroom. Two bedroom suites will have one bathroom while four-bedroom suites will be equipped with two bathrooms.

The project began construction on June 1, 2017 and is valued at $34 million. Kirksey Architecture designed the project and Moss & Associates is the general contractor. Servitas is the project’s developer.

Related Stories

| Nov 13, 2012

Have colleges + universities gone too far with "Quality of Life" buildings?

We'd like your input - recent projects, photo/s, renderings, and expert insight - on an important article we're working on for our Jan 2013 issue

| Nov 11, 2012

Greenbuild 2012 Report: Higher Education

More and more colleges and universities see sustainainably designed buildings as a given

| Oct 30, 2012

Lord, Aeck & Sargent announces four student life facility wins

Projects recognize the architecture firm’s expertise on a nationwide basis.

| Oct 4, 2012

2012 Reconstruction Awards Gold Winner: Wake Forest Biotech Place, Winston-Salem, N.C.

Reconstruction centered on Building 91.1, a historic (1937) five-story former machine shop, with its distinctive façade of glass blocks, many of which were damaged. The Building Team repointed, relocated, or replaced 65,869 glass blocks.

| Sep 19, 2012

Modular, LEED-Gold Certified Dormitory Accommodates Appalachian State University Growth

By using modular construction, the university was able to open a dorm a full year earlier than a similar dorm built at the same time with traditional construction.

| Sep 6, 2012

CPPI awarded $30.3 million contract for University of Florida’s Harrell Medical Education Building

The specialized interdisciplinary learning environment will serve as a focal point for integration and program development for all primary care educational activities in the College of Medicine.

| Sep 5, 2012

Skanska tops out residence hall complex at the University of Delaware

Construction firm achieves structural milestone for $71 million student housing expansion project.

| Aug 30, 2012

John S Clark Co. completes teaching lab at UNC Wilmington

Three-story building provides offices, classrooms, and labs.

| Aug 7, 2012

Pioneering revival

Financial setbacks didn’t stop this Building Team from transforming the country’s first women’s medical school into a new home for college students.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021