flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Cal Poly Research and Innovation Center includes features for a COVID-19 world

University Buildings

New Cal Poly Research and Innovation Center includes features for a COVID-19 world

ZGF Architects is designing the building.


By David Malone, Associate Editor | July 15, 2020
Cal Poly Frost Center exterior

All renderings courtesy ZGF Architects

Cal Poly San Luis Obispo’s newest addition to its campus, The William and Linda Frost Center for Research and Innovation, is currently under construction.

The four-story, 103,800-sf Center is dedicated to undergraduate students who engage in faculty-mentored research each year and work side-by-side with professors. The Frost Center will bring three colleges together under one roof: the College of Liberal Arts, the College of Science and Mathematics, and the College of Agriculture, Food, and Environmental Sciences. It is designed to support the educational priorities of a growing student and faculty population, promote interdisciplinary communities, and provide academic space.

 

Cal Poly Frost Center exterior and green space

 

Included within the building are 19 flexible laboratory and teaching spaces, large general-purpose classrooms, collaboration areas, faculty/staff offices, a recording studio, editing bays, a high-end computer lab, and a teaching kitchen. The teaching kitchen is showcased on the first floor and is highly visible from the atrium.

 

Cal Poly exterior and entrance

 

The modularly planned laboratories provide flexibility for any future changes and can be combined to produce large, open laboratories or subdivided to produce small instrument or special-use laboratories. A “big room” for the College of Liberal Arts will give students a space where they can create, perform, test, record, and display their work for passersby along the adjacent hallways and exterior pathways.

Passive design strategies and natural ventilation will create a healthy building for occupants. 100% outside air from air handling units and operable windows in offices allow the building to avoid the recirculation of air that might provide an avenue for airborne exposure to viruses such as COVID-19.

 

Cal Poly entrance area

 

The project is designed to achieve LEED Gold and includes sustainable features such as passive heating and cooling strategies, will consume 30% less potable water, and will have the capacity to accommodate future rooftop solar panels.

 

See Also: Apartments and condos occupy what was once a five-story car dealership

 

The William and Linda Frost Center for Research and Innovation is slated for completion in late 2021.

 

Cal Poly interior

Related Stories

University Buildings | Apr 2, 2019

Denning House completes at Stanford University

Ennead Architects designed the building.

University Buildings | Mar 27, 2019

Veterans Resource Center at Cypress College breaks ground

Sundt Construction is building the project.

Mixed-Use | Feb 21, 2019

An R&D-oriented innovation district is taking shape in the heart of Durham, N.C.

Its buildout has included converting old tobacco warehouses into offices and labs.

University Buildings | Jan 29, 2019

The Colorado School of Mines CoorsTek Center opens

Bohlin Cywinski Jackson designed the building.

University Buildings | Dec 17, 2018

SCUP and University of Pennsylvania School of Nursing release study results on lactation policy and facilities in U.S. higher education

There is a wide variability between how campuses accommodate the needs of breastfeeding mothers.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021