A new 12-story hotel has broken ground in Denver near Coors Field and Union Station and while the majority of the hotel will have a sleek, modern aesthetic, one component will definitely stand out from the rest.
The historic Denver Hose Company No.1 building, which was constructed in 1883, will be incorporated into the hotel’s design. The building was listed as a city historic landmark in 1986 and is one of the only remaining structures from an early Denver neighborhood called the “Bottoms,” The Denver Post reports. The building is described as having beautiful brickwork, especially around the two front facing arches.
The building will be completely restored as part of the $80 million hospitality project and will serve as a restaurant and outdoor patios for the hotel. The patios will face Chestnut Place and 20th Street.
And the restoration couldn’t come a moment too soon. The fire station has been in a state of disrepair for years now, to the point where some people worried about it becoming a safety issue. It had all the looks of a structure ready to collapse on itself, but with help from the city and Historic Denver (an organization that preserves local Denver history, architecture, and landscapes), the building was stabilized until the restoration could begin.
Johnson Nathan Strohe and Boss Architecture designed the new hotel, which will be a Hilton Garden Inn. It will comprise 233 guest rooms and be operated by Davidson Hotels. Among the amenities the hotel will offer are a ballroom, meeting space, underground parking, and a fitness center.
The new Hilton Garden Inn is expected to open in early 2019.
Related Stories
| Aug 11, 2010
Cannon Design’s European-inspired Sparkling Hill Resort breaks ground
Cannon Design, a leading international architectural, engineering and planning firm, is pleased to announce that the firm’s Sparkling Hill Resort and Wellness Hotel in Vernon, BC, has broken ground.
| Aug 11, 2010
10 tips for mitigating influenza in buildings
Adopting simple, common-sense measures and proper maintenance protocols can help mitigate the spread of influenza in buildings. In addition, there are system upgrades that can be performed to further mitigate risks. Trane Commercial Systems offers 10 tips to consider during the cold and flu season.
| Aug 11, 2010
Skanska, Turner most active in U.S. hotel construction, according to BD+C's Giants 300 report
A ranking of the Top 50 Hotel Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
McCarthy, Skanska among nation's largest healthcare contractors, according to BD+C's Giants 300 report
A ranking of the Top 50 Healthcare Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
AECOM, Arup, Gensler most active in commercial building design, according to BD+C's Giants 300 report
A ranking of the Top 100 Commercial Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
New book provides energy efficiency guidance for hotels
Recommendations on achieving 30% energy savings over minimum code requirements are contained in the newly published Advanced Energy Design Guide for Highway Lodging. The energy savings guidance for design of new hotels provides a first step toward achieving a net-zero-energy building.
| Aug 11, 2010
Perkins+Will master plans Vedanta University teaching hospital in India
Working together with the Anil Agarwal Foundation, Perkins+Will developed the master plan for the Medical Precinct of a new teaching hospital in a remote section of Puri, Orissa, India. The hospital is part of an ambitious plan to develop this rural area into a global center of education and healthcare that would be on par with Harvard, Stanford, and Oxford.
| Aug 11, 2010
Turner Building Cost Index dips nearly 4% in second quarter 2009
Turner Construction Company announced that the second quarter 2009 Turner Building Cost Index, which measures nonresidential building construction costs in the U.S., has decreased 3.35% from the first quarter 2009 and is 8.92% lower than its peak in the second quarter of 2008. The Turner Building Cost Index number for second quarter 2009 is 837.