flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New digital platform to foster construction supply chains free of forced labor

New digital platform to foster construction supply chains free of forced labor

Will provide transparency on where building materials come from and how they are made.


By Peter Fabris, Contributing Editor  | September 28, 2022
Construction Supply Chain
Courtesy Pexels.

Design for Freedom by Grace Farms and the U.S. Coalition on Sustainability formed a partnership to advance shared goals regarding sustainable and ethical building material supply chains that are free of forced labor.

SustainChain, the coalition’s technology platform, uses advanced digital technology and machine learning to bring together innovators, impact investors, businesses, NGOs, and public-private sector alliances to advance the UN Sustainable Development Goals (SDGs). That program is a comprehensive plan consisting of 17 interrelated goals that address and resolve global humanitarian challenges.

“The next step in architectural justice is to include social equity and ethical material transparency in the evaluation of our supply chains so we can understand where our building materials come from and how they are made,” said Grace Farms Foundation CEO and founder Sharon Prince. “Design for Freedom is doing just that—raising awareness of forced labor embedded in our building materials and initializing responses to disrupt forced labor in the building materials supply chain and to come together to create more transparency.”

“As a first of its kind accelerator for achieving a more just and sustainable world, SustainChain is providing a free public utility designed to unify and rapidly scale sustainability efforts,” said Jacqueline Corbelli, founder of the US Coalition on Sustainability and creator of SustainChain.

Related Stories

| Sep 13, 2010

Campus housing fosters community connection

A 600,000-sf complex on the University of Washington's Seattle campus will include four residence halls for 1,650 students and a 100-seat cafe, 8,000-sf grocery store, and conference center with 200-seat auditorium for both student and community use.

| Sep 13, 2010

Second Time Around

A Building Team preserves the historic facade of a Broadway theater en route to creating the first green playhouse on the Great White Way.

| Sep 13, 2010

Palos Community Hospital plans upgrades, expansion

A laboratory, pharmacy, critical care unit, perioperative services, and 192 new patient beds are part of Palos (Ill.) Community Hospital's 617,500-sf expansion and renovation.

| Sep 13, 2010

China's largest single-phase hospital planned for Shanghai

RTKL's Los Angles office is designing the Shanghai Changzheng New Pudong Hospital, which will be the largest new hospital built in China in a single phase.

| Sep 13, 2010

World's busiest land port also to be its greenest

A larger, more efficient, and supergreen border crossing facility is planned for the San Ysidro (Calif.) Port of Entry to better handle the more than 100,000 people who cross the U.S.-Mexico border there each day.

| Sep 13, 2010

Triple-LEED for Engineering Firm's HQ

With more than 250 LEED projects in the works, Enermodal Engineering is Canada's most prolific green building consulting firm. In 2007, with the firm outgrowing its home office in Kitchener, Ont., the decision was made go all out with a new green building. The goal: triple Platinum for New Construction, Commercial Interiors, and Existing Buildings: O&M.

| Sep 13, 2010

'A Model for the Entire Industry'

How a university and its Building Team forged a relationship with 'the toughest building authority in the country' to bring a replacement hospital in early and under budget.

| Sep 13, 2010

Committed to the Core

How a forward-looking city government, a growth-minded university, a developer with vision, and a determined Building Team are breathing life into downtown Phoenix.

| Sep 13, 2010

Conquering a Mountain of Construction Challenges

Brutal winter weather, shortages of materials, escalating costs, occasional visits from the local bear population-all these were joys this Building Team experienced working a new resort high up in the Sierra Nevada.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021