Earlier this month, the real estate investment trust SunStone Hotel Investors disclosed that it had contracted to acquire the new Four Seasons Resort Napa Valley, an 85-room luxury hotel located in Calistoga, Calif., for $177.5 million. Subsequent news reports pegged the price at closer to $175 million, which if consummated would still be the second-highest per-key hospitality purchase in the U.S.
With this acquisition, SunStone claims that it would own 24 percent of the luxury-market hotel rooms in northern California’s wine country, and 33 percent of the luxury market’s event space.
For the seller, Boston-based private equity firm Alcion Ventures, this acquisition represents the culmination of a decade-long trek that included construction delays (ground broke on the hotel in 2014) and different AEC project team members along the way.
AN ORGANIC WINERY DISTINGUISHES THIS RESORT
What makes this 22.5-acre property unique is that is the only Napa Valley resort with a working winery and vineyard on its premises. Elusa Winery, which specializes in Cabernet Sauvignon, sits on 4.7 acres and includes, along with its growing fields, a 4,960-sf production room, a 698-sf private tasting room, a 1,018-sf public tasting room, and 3,180 sf for barrel storage. The hotel and winery are adjacent to 20 two-, three-, and four-bedroom private residences whose asking price started at $3.5 million. (The residences are not part of the acquisition.)
The hotel, with 67 guest rooms and 18 suites, had a soft opening on October 1 and debuted officially a month later. Developed by Bald Mountain Development, which has bases in Aspen, Colo., and in Napa, the hotel was designed by Hirsch Bednar Associates (which specializes in hospitality) with Erin Martin Design, and was completed by Suffolk, which took over the project’s construction management duties in 2019 from another contractor that had built other Four Seasons resorts but wasn’t meeting the client’s quality expectations on the Napa project, according to Jim Stanley, Suffolk’s COO.
MODEST BEGINNINGS
Suffolk built the Four Seasons Resort and Residences in Boston, and was hired for the Napa project at the suggestion of Alcion Ventures. “When we were asked to step in, we essentially brought in people from across the U.S., and were able to ramp up our team in two to three months,” said Stanley. While most of the Napa property’s structures had been topped off when Suffolk arrived, “there was a lot of corrective work required to meet Four Seasons’ standards,” Stanley recalled in a video interview with BD+C yesterday. For example, nearly all the structures on the property needed to be reskinned, he said.
Several news reports peg the cost of developing and building Four Seasons Napa above $200 million. The resort’s amenities include two pools, two restaurants, fire pits, a 6,079-sf indoor spa and 6,850-sf outdoor spa; a 4,316-sf fitness center, and 16,341 sf of indoor/outdoor meeting spaces, with seven rooms. (The resort is positioning itself as a wedding destination.)
This luxurious resort bears only a faint resemblance to this property’s humble beginnings. From 1993 through 2012, it was home to Silver Rose Resort, a bed and breakfast with 20 rooms. Winemaker Thomas Rivers Brown took the reins of the operation in 2012, two years after Elusa was formed and started producing wine, initially with grapes from other vineyards. Brown reportedly oversaw the design of the new winery, which has an operational partnership with Four Seasons Resort. The winery opened its tasting room in September.
Related Stories
| Aug 11, 2010
Webcor, Hunt Construction lead the way in mixed-use construction, according to BD+C's Giants 300 report
A ranking of the Top 30 Mixed-Use Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Report: Fraud levels fall for construction industry, but companies still losing $6.4 million on average
The global construction, engineering and infrastructure industry saw a significant decline in fraud activity with companies losing an average of $6.4 million over the last three years, according to the latest edition of the Kroll Annual Global Fraud Report, released today at the Association of Corporate Counsel’s 2009 Annual Meeting in Boston. This new figure represents less than half of last year’s amount of $14.2 million.
| Aug 11, 2010
First CityCenter projects earn LEED Gold
CityCenter announced today that it has received three Leadership in Energy and Environmental Design LEED Gold certifications from the U.S. Green Building Council for: 1) ARIA Resort's hotel tower; 2) ARIA Resort's convention center and theater; 3) Vdara Hotel. ARIA and Vdara will open in December on the Las Vegas Strip and are the first of CityCenter's developments to be LEED certified.
| Aug 11, 2010
And the world's tallest building is…
At more than 2,600 feet high, the Burj Dubai (right) can still lay claim to the title of world's tallest building—although like all other super-tall buildings, its exact height will have to be recalculated now that the Council on Tall Buildings and Urban Habitat (CTBUH) announced a change to its height criteria.
| Aug 11, 2010
Spa resort in harmony with mountain setting
The Sparkling Hill Resort and Wellness Hotel in Vernon, B.C., looks as if it was chiseled out of bedrock and jutting from the mountainside. Designed by the Victoria, B.C., office of Cannon Design, the 240,000-sf resort has 152 guest rooms with floor-to-ceiling windows and spa-like bathrooms, as well as a signature 20,000-sf whole-body wellness spa with treatment rooms designed to feel like they...
| Aug 11, 2010
Triangular tower targets travelers
Chicago-based Goettsch Partners is designing a new mixed-use high-rise for the Chinese city of Dalian, located on the Yellow Sea coast. Developed by Hong Kong-based China Resources Land Limited, the tower will have almost 1.1 million sf, which includes a 377-room Grand Hyatt hotel, 84 apartments, three restaurants, banquet space, and a spa and fitness center.
| Aug 11, 2010
CityCenter projects get LEED Gold
MGM Mirage and Infinity World Development have received LEED Gold certification for the first three CityCenter projects: the ARIA Resort hotel tower, ARIA Resort convention center and theater, and the Vdara Hotel (above). The CityCenter developers anticipate Gold or Silver LEED certification for the project's remaining developments, which include a Mandarin Oriental hotel, a 500,000-sf retail a...
| Aug 11, 2010
RMJM unveils design details for $1B green development in Turkey
RMJM has unveiled the design for the $1 billion Varyap Meridian development it is master planning in Istanbul, Turkey's Atasehir district, a new residential and business district. Set on a highly visible site that features panoramic views stretching from the Bosporus Strait in the west to the Sea of Marmara to the south, the 372,000-square-meter development includes a 60-story tower, 1,500 resi...
| Aug 11, 2010
'Feebate' program to reward green buildings in Portland, Ore.
Officials in Portland, Ore., have proposed a green building incentive program that would be the first of its kind in the U.S. Under the program, new commercial buildings, 20,000 sf or larger, that meet Oregon's state building code would be assessed a fee by the city of up to $3.46/sf. The fee would be waived for buildings that achieve LEED Silver certification from the U.
| Aug 11, 2010
Five-star resort breaks ground on the Black Sea
Construction work has commenced on a five-star resort and leisure destination along the Black Sea coast in Batumi, Georgia. The RTKL-designed resort consists of two towers rising 86 and 58 meters over a two-story podium. The larger tower contains 250 guestrooms and suites while the smaller tower offers 78 residential apartments.