The Fenestration Manufacturers Association (FMA), the Fenestration and Glazing Industry Alliance (FGIA), and the Window & Door Manufacturers Association (WDMA) have released a new document focused on replacement windows.
FMA/AAMA/WDMA 2710-20, Guidelines for the Full Frame Replacement of Windows without Removal of Exterior Brick Veneer covers windows replacement in residential and light commercial buildings of not more than three stories above grade. It pertains to structures using a membrane/drainage system, a surface barrier drainage, or a wall system without a reliable membrane drainage system.
The document is focused on the full frame replacement without removal of external brick veneer. It describes methods where the cavity between the wall and façade needs to be blocked and sealed.
“This newly document is the first installation practice to address this window-wall condition, which also includes a 'decision-tree' matrix to guide installers to the most appropriate methods,” said Jim Katsaros (DuPont Performance Building Solutions), co-chair of the Joint Replacement Window Task Group. “The task group evaluated numerous configuration variations and completed representative installations with comprehensive field testing in actual homes in Baton Rouge, Louisiana.”
Related Stories
| Jan 16, 2012
Mid-Continent Tower wins 25 Year Award from AIA Eastern Oklahoma
Designed by Dewberry, iconic tower defines Tulsa’s skyline.
| Jan 15, 2012
Hollister Construction Services oversees interior office fit-out for Harding Loevner
The work includes constructing open space areas, new conference, trading and training rooms, along with multiple kitchenettes.
| Jan 15, 2012
Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.
The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.
| Jan 12, 2012
CSHQA receives AIA Northwest & Pacific Region Merit Award for Idaho State Capitol restoration
After a century of service, use, and countless modifications which eroded the historical character of the building and grounds, the restoration brought the 200,000-sf building back to its former grandeur by restoring historical elements, preserving existing materials, and rehabilitating spaces for contemporary uses.
| Jan 6, 2012
Summit Design+Build completes Park Place in Illinois
Summit was responsible for the complete gut and renovation of the former auto repair shop which required the partial demolition of the existing building, while maintaining the integrity of the original 100 year-old structure, and significant re-grading and landscaping of the site.
| Jan 4, 2012
Shawmut Design & Construction awarded dorm renovations at Brown University
Construction is scheduled to begin in June 2012, and will be completed by December 2012.
| Jan 3, 2012
The Value of Historic Paint Investigations
An expert conservator provides a three-step approach to determining a historic building’s “period of significance”—and how to restore its painted surfaces to the correct patterns and colors.
| Jan 3, 2012
28th Annual Reconstruction Awards: Bringing Hope to Cancer Patients
A gothic-style structure is reconstructed into comfortable, modern patient residence facility for the American Cancer Society.
| Jan 3, 2012
Rental Renaissance, The Rebirth of the Apartment Market
Across much of the U.S., apartment rents are rising, vacancy rates are falling. In just about every major urban area, new multifamily rental projects and major renovations are coming online. It may be too soon to pronounce the rental market fully recovered, but the trend is promising.