flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Jersey’s new surgical tower features state’s first intraoperative MRI system

Healthcare Facilities

New Jersey’s new surgical tower features state’s first intraoperative MRI system

The Helena Theurer Pavilion at Hackensack (N.J.) University Medical Center features 24 operating rooms, 175 medical beds, and New Jersey’s first intraoperative MRI system.


By Novid Parsi, Contributing Editor | March 22, 2023
New Jersey’s new surgical tower features state’s first intraoperative MRI system All photos courtesy Page
All photos courtesy Page

Hackensack (N.J.) University Medical Center recently opened its 530,000-sf Helena Theurer Pavilion, a nine-story surgical and intensive care tower designed by RSC Architects and Page. The county’s first hospital, Hackensack University Medical Center, a 781-bed nonprofit teaching and research hospital, was founded in 1888.

The Pavilion features New Jersey’s first intraoperative MRI system, used during neurosurgical and neuro-interventional procedures to help neurosurgeons accurately remove tumors and treat conditions such as Parkinson’s disease and epilepsy. Of the facility’s 24 operating rooms, six have been designed to accommodate robotic-assisted surgery systems, allowing surgeons to perform minimally invasive procedures that may reduce recovery time and improve outcomes. 

The Pavilion also includes the following: 

  • 72 post-anesthesia care unit beds and 50 intensive care unit (ICU) beds
  • 175 medical/surgical beds, including a Musculoskeletal Institute and intermediate care rooms
  • 12 negative-pressure rooms to reduce the risk of aerosolized disease transmission within the hospital
  • Six da Vinci robotic surgical systems, including four orthopedic robots for joint replacement procedures
  • All-private patient rooms

In addition, the entire building can be converted to a negative-pressure facility in the event of a future pandemic or public health emergency.

The Helena Theurer Pavilion incorporates features that enhance patient comfort, patient safety, and employee efficiency. These include dedicated CT imaging on the ICU floor, a monitor tablet outside each patient room for employees, in-room team workstations, and patient lift systems. 

“This is one of the largest hospital construction projects in the country, and we could not be more proud to advance healthcare for the communities we are privileged to serve,” Robert C. Garrett, CEO of Hackensack Meridian Health, said in a statement.

On the Building Team:
Owner: Hackensack Meridian Health
Design and medical planning architect: Page
Architect of record (interior build-out of the Pavilion): Page
Architect of record (overall): RSC Architects
MEP: Syska Hennessy Group
Structural engineer: Reuther + Bowen
Construction manager: Blanchard Turner

 

New Jersey’s new surgical tower features state’s first intraoperative MRI system All photos courtesy Page

New Jersey’s new surgical tower features state’s first intraoperative MRI system All photos courtesy Page

New Jersey’s new surgical tower features state’s first intraoperative MRI system All photos courtesy Page

New Jersey’s new surgical tower features state’s first intraoperative MRI system All photos courtesy Page

Related Stories

Healthcare Facilities | Oct 2, 2020

Healthcare Design Awards promote projects that heal

Awards program highlights trends in healthcare facility designs.

University Buildings | Sep 16, 2020

A new interprofessional hub opens on U. Minnesota’s campus

The Health Sciences Education Center includes two floors for simulation and immersive training.

Healthcare Facilities | Sep 16, 2020

New Foster + Partners-designed hospital begins construction in Cairo

The project focuses on natural light, greenery, and views of the outside.

Healthcare Facilities | Sep 10, 2020

Easing the oncology journey: The role of urgent care

Oncology patients are better served when they’re connected to the right staff.

Giants 400 | Aug 28, 2020

2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms

The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.

Healthcare Facilities | Aug 27, 2020

A hospital addition in Maryland was designed and built in 120 days

Lean practices, and early engagement with the county’s permitting department, moved this project forward quickly.

Building Team | Aug 21, 2020

A healthcare project in Wisconsin benefits from including MEP subs in early design discussions

Prefabrication played a major role in quickening construction.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021