On July 4, 2026, the Theodore Roosevelt Presidential Library is scheduled to open on 93 acres in Medora, a town in North Dakota with under 130 permanent residents, but which nonetheless has become synonymous with the 26th President of the United States, who lived there for several years in the 1880s.
The under-construction $333 million library, situated on a Badlands butte near the Burning Hills Amphitheater, will not be a repository for Roosevelt’s papers or archives (which are mostly housed at Harvard University). Instead, the library’s goal is to honor the President’s legacy as a conservationist. Its design is informed by Roosevelt’s interest in environmental stewardship and his reflections about the landscape.
The single-story, 93,000-sf library/museum “is a journey preserving the existing landscape of diverse habitats punctuated with small pavilions allowing for reflection and activity,” according to the project’s website. “The main building’s gently sloping roof looks to the northeast, gazing out to the [70,447-acre] National Park, historical settings in the Little Missouri River valley, and the Elkhorn Ranch far in the distance, further connecting the Library of tomorrow with its origins of the past.”
“The Library is the landscape,” Edward O’Keefe, CEO of the Theodore Roosevelt Presidential Library, told the New York Times.
Mass timber complements construction
Mass timber is a significant component in the construction of the Library. The Mercer Mass Timber subsidiary of Mercer International is providing nearly 1,800 cubic meters of cross-laminated timber and glulam––harvested from sustainably managed forests––which are being used for the building’s structure that includes a green walkable roof, as well as a one-mile-long boardwalk loop in front of the Library that aligns with the roof’s curvature.
The green roof aims to restore the vegetation disrupted within the building’s footprint, and to create a habitat for native plants. The Library is sponsoring this Native Plant Project in partnership with Resource Environmental Solutions, the nation’s largest ecological restoration company; and North Dakota State University.
Within the Library there will be “narrative galleries,” as well as community spaces, a café, and an auditorium, which the Times pointed out would be large enough to host candidate debates during presidential election campaigns.
The Library “represents a transition we’re seeing in modern library and architectural design, where community spaces are being constructed with long-term sustainability in mind,” said Nick Milestone, Mercer’s Vice President of Projects and Construction, in a prepared statement.
In partnership with the project’s general contractor JE Dunn Construction, Mercer is providing mass timber design assistance, materials, and coordination and logistics. Other AEC firms involved in this project: Snøhetta (design and landscape architect), JLG Architects (AOR), Seagate (mass timber installation), Magnusson Klemencic Associates (Engineer of Record), and Command Industires (steel subcontractor).
The Library––which is four and a half hours north of Mount Rushmore and seven hours northeast of Yellowstone National Park––is targeting LEED Platinum and Living Building Challenge certifications. Its goal is to be net-zero energy, emissions, water, and waste.
Related Stories
Libraries | Jan 13, 2023
One of the world’s largest new libraries opens in Shanghai
Designed by Schmidt Hammer Lassen Architects, Shanghai Library East covers more than 1.2 million sf, 80% of it dedicated to community activity.
Libraries | Jan 12, 2023
An adjacent community center enhances South Bend’s library
This $40 million renovation and addition are part of a larger urban revitalization scheme.
Libraries | Oct 25, 2022
Stanford’s renovated library wing syncs with the region’s tech industry
Collaborative space replaces stacks.
Giants 400 | Aug 22, 2022
Top 90 Construction Management Firms for 2022
CBRE, Alfa Tech, Jacobs, and Hill International head the rankings of the nation's largest construction management (as agent) and program/project management firms for nonresidential and multifamily buildings work, as reported in Building Design+Construction's 2022 Giants 400 Report.
Giants 400 | Aug 19, 2022
2022 Giants 400 Report: Tracking the nation's largest architecture, engineering, and construction firms
Now 46 years running, Building Design+Construction's 2022 Giants 400 Report rankings the largest architecture, engineering, and construction firms in the U.S. This year a record 519 AEC firms participated in BD+C's Giants 400 report. The final report includes more than 130 rankings across 25 building sectors and specialty categories.
Cultural Facilities | Aug 5, 2022
A time and a place: Telling American stories through architecture
As the United States enters the year 2026, it will commence celebrating a cycle of Sestercentennials, or 250th anniversaries, of historic and cultural events across the land.
Libraries | Jul 20, 2022
Canada to open one of the world’s largest library and archive facilities
When it opens in 2026, Ādisōke is expected to be one of the largest library and archive facilities in the world.
Libraries | Jul 5, 2022
Libraries, despite digital disruption, remain community assets
Washington D.C. is executing a master plan to build local facilities that can adapt to changing technologies.
Libraries | Jun 21, 2022
Kingston, Ontario, library branch renovation cuts energy use to 55% of benchmark
A recent renovation of the Kingston (Ontario) Frontenac Public Library Central Branch greatly boosted energy and water efficiency while making the facility healthier and safer.
Libraries | Jun 8, 2022
Welcome to the hybrid library
Libraries have grown to become the intellectual and social hubs of campus, where, prior to March 2020, students, researchers, and faculty gathered to collaborate and connect.