flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Phase 1 Environmental Site Assessment standard debuts in 2021

Codes and Standards

New Phase 1 Environmental Site Assessment standard debuts in 2021

Will affect 250,000 commercial real estate deals a year.


By Peter Fabris, Contributing Editor | April 14, 2021

Courtesy Pixabay

A new version of ASTM E1527 standard for Phase 1 Environmental Site Assessments is expected to be completed this year.

The new standard would affect about 250,000 commercial real estate deals a year. One of the proposed changes could be interpreted to require the same level of historical research of adjoining properties as is done for the subject property. The assessment, in such a case, would require additional historical research to fill in data gaps for certain adjoining properties, which could increase the scope and cost of some reports and potentially delay transactions.

Other proposed changes add PFAS and other emerging contaminants to the list of “non-scope issues,” raising awareness of the issue that some may want to evaluate as is commonly done with asbestos and mold. The draft new standard aims to call more attention to significant data gaps, a substantial piece of information that wasn’t feasible to obtain given time or budget constraints.

Data gaps would be assessed as to whether they materially affect the environmental professional’s ability to identify Recognized Environmental Conditions (RECs). The ASTM committee will continue to discuss, refine, and vote on proposed changes and has a goal of releasing the new standard by the end of the year.

Related Stories

Codes and Standards | Feb 2, 2022

Public works contracting reform advances in New York State

Governor signs bill to form advisory council that will propose policy changes.

Codes and Standards | Feb 2, 2022

Commercial and multifamily construction starts rebounded in 2021

Following COVID uncertainty in 2020, the industry recovered, but still lags 2019 levels.

Codes and Standards | Feb 1, 2022

Biden Administration launches state, local coalition to boost building performance standards

Will focus on energy efficiency and electrification across the buildings sector.

Codes and Standards | Jan 26, 2022

Downtown digital twin to aid Las Vegas in setting policy priorities

Will be used to address energy use, emissions, traffic, parking, noise, and emergency management.

Codes and Standards | Jan 25, 2022

Modeling tool helps compare options for HVAC systems when little known about a building

Compares projected costs and energy usage for all HVAC systems and hot water consumption.

Codes and Standards | Jan 25, 2022

Critics slam proposed revamp of California’s solar net energy metering rate

Could make rooftop solar panels unaffordable for most customers.

Sponsored | Resiliency | Jan 24, 2022

Norshield Products Fortify Critical NYC Infrastructure

New York City has two very large buildings dedicated to answering the 911 calls of its five boroughs. With more than 11 million emergency calls annually, it makes perfect sense. The second of these buildings, the Public Safety Answering Center II (PSAC II) is located on a nine-acre parcel of land in the Bronx. It’s an imposing 450,000 square-foot structure—a 240-foot-wide by 240-foot-tall cube. The gleaming aluminum cube risesthe equivalent of 24 stories from behind a grassy berm, projecting the unlikely impression that it might actually be floating. Like most visually striking structures, the building has drawn as much scorn as it has admiration. 

Codes and Standards | Jan 24, 2022

N.Y. governor calls for ban on natural gas in new buildings

Action follows New York City’s ban.

Codes and Standards | Jan 19, 2022

EPA may expand product lineup that can earn WaterSense label

Would include systems that enhance water quality at the tap.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021