The 72,000-sf Toronto York Recreation Centre in Ontario, which opened officially on April 23, is situated at the intersection of three neighborhoods: Mount Dennis, Keelesdale, and Rockcliffe.
The centre, which is owned by the city of Toronto and operated by its Parks, Forestry, and Recreation department, is free to the public. And since April through early July 10,000 people had signed up for its various programs. “We see this centre as a catalyst for growth,” says Duff Balmer, OAA, NSAA, MRIAC, Design Principal for Perkins +Will Canada Architects, which designed the building.
The rec centre cost 27.147 million Canadian dollars (US$21.45 million) to build. It was one of the initiatives that sprang from Toronto Mayor David Miller’s Strong Neighborhoods Task Force. It includes a 25-meter, six-lane indoor pool, double gym, fitness studio, weight room, indoor track, kitchen, five multipurpose rooms, and universal change rooms.
Lots of natural light streams into the rec centre's double gymnasium. Image: Tom Arban Photography
P+W engaged in “extensive” community outreach during the design process, which to Balmer’s surprise attracted a lot of younger people. Those sessions led to the inclusion of the track, a viewing gallery for the pool, a dance studio, and a music room.
“We also heard a lot about the need for safety,” says Balmer, which translated into streaming more natural light into the spaces. (The gym is the most obvious manifestation of this.)
The site of this 72,000-sf facility is complicated by being on the banks of a ravine for the Black Creek River. The landscape architect was Fleisher Ridout Partnership. Image: Tom Arban Photography
Prior to the rec center, this site had been underutilized. It had a raggedy baseball diamond, and its access area had devolved into a dumping ground that needed to be remediated before construction could begin.
The site is located on the west bank of a ravine along the Black Creek River, and the building needed to be positioned outside of the river’s floodplain, which limited the amount of land it had to work with.
A 25-meter, six-lane pool is one of the rec centre's features. Image: Tom Arban Photography
On the positive side, a vehicular bridge built over the river connects the rec centre to Keelesdale Park. And the facility, which is about eight miles from downtown Toronto, will be located near a train station for the new Metrolinx Eglinton Crosstown light-rail line, which is currently under construction.
The rec center was substantially completed last December and had a soft opening on February 18. The project’s hard and soft costs totaled C$33.27 million. The Building Team included Bondfield Construction Company (GC), the city’s Capital Projects unit (project manager), and Fleisher Ridout Partnership (landscape architect).
Related Stories
| Aug 11, 2010
Pella Corporation ranks highest in customer satisfaction
Pella Corporation has earned the prestigious J.D. Power and Associates award for “Highest in Customer Satisfaction among Window and Patio Door Manufacturers” for the third year in a row.
| Aug 11, 2010
Pella introduces BIM models for windows and doors
Pella Corporation now offers three-dimensional (3D) window and door models for use in Building Information Modeling (BIM) projects by architects, designers, and others looking for aesthetically correct, easy-to-use, data-rich 3D drawings.
| Aug 11, 2010
Sargent launches power over ethernet campus access control solution
Sargent takes campus access control to the edge of the network with the new Passport 1000 P1 Power over Ethernet (PoE) hardware. Passport P1 connects to a facility’s Ethernet network with standard cabling, and provides full online access control even when the network is unavailable.
| Aug 11, 2010
AAMA developing product-based green certification program for fenestration
The American Architectural Manufacturers Association is working on a product-based green certification program for residential and commercial fenestration, the organization announced today. AAMA will use the results of a recent green building survey to help shape the program. Among the survey's findings: 77% of respondents reported a green certification program for fenestration would benefit the product selection process for their company.
| Aug 11, 2010
NoricF4 custom metal ICF frames receive fire ratings, comply with antiterrorism standards for buildings
Reward Wall Systems' NoricF4 Custom Metal ICF Frames have received fire ratings of 1.5 hours to 3 hours and they have been evaluated to be in compliance with the prescriptive requirements of the Department of Defense Minimum Antiterrorism Standards for Buildings for blast/force protection.
| Aug 11, 2010
AIA Course: Enclosure strategies for better buildings
Sustainability and energy efficiency depend not only on the overall design but also on the building's enclosure system. Whether it's via better air-infiltration control, thermal insulation, and moisture control, or more advanced strategies such as active façades with automated shading and venting or novel enclosure types such as double walls, Building Teams are delivering more efficient, better performing, and healthier building enclosures.
| Aug 11, 2010
Glass Wall Systems Open Up Closed Spaces
Sectioning off large open spaces without making everything feel closed off was the challenge faced by two very different projects—one an upscale food market in Napa Valley, the other a corporate office in Southern California. Movable glass wall systems proved to be the solution in both projects.