The 72,000-sf Toronto York Recreation Centre in Ontario, which opened officially on April 23, is situated at the intersection of three neighborhoods: Mount Dennis, Keelesdale, and Rockcliffe.
The centre, which is owned by the city of Toronto and operated by its Parks, Forestry, and Recreation department, is free to the public. And since April through early July 10,000 people had signed up for its various programs. “We see this centre as a catalyst for growth,” says Duff Balmer, OAA, NSAA, MRIAC, Design Principal for Perkins +Will Canada Architects, which designed the building.
The rec centre cost 27.147 million Canadian dollars (US$21.45 million) to build. It was one of the initiatives that sprang from Toronto Mayor David Miller’s Strong Neighborhoods Task Force. It includes a 25-meter, six-lane indoor pool, double gym, fitness studio, weight room, indoor track, kitchen, five multipurpose rooms, and universal change rooms.
Lots of natural light streams into the rec centre's double gymnasium. Image: Tom Arban Photography
P+W engaged in “extensive” community outreach during the design process, which to Balmer’s surprise attracted a lot of younger people. Those sessions led to the inclusion of the track, a viewing gallery for the pool, a dance studio, and a music room.
“We also heard a lot about the need for safety,” says Balmer, which translated into streaming more natural light into the spaces. (The gym is the most obvious manifestation of this.)
The site of this 72,000-sf facility is complicated by being on the banks of a ravine for the Black Creek River. The landscape architect was Fleisher Ridout Partnership. Image: Tom Arban Photography
Prior to the rec center, this site had been underutilized. It had a raggedy baseball diamond, and its access area had devolved into a dumping ground that needed to be remediated before construction could begin.
The site is located on the west bank of a ravine along the Black Creek River, and the building needed to be positioned outside of the river’s floodplain, which limited the amount of land it had to work with.
A 25-meter, six-lane pool is one of the rec centre's features. Image: Tom Arban Photography
On the positive side, a vehicular bridge built over the river connects the rec centre to Keelesdale Park. And the facility, which is about eight miles from downtown Toronto, will be located near a train station for the new Metrolinx Eglinton Crosstown light-rail line, which is currently under construction.
The rec center was substantially completed last December and had a soft opening on February 18. The project’s hard and soft costs totaled C$33.27 million. The Building Team included Bondfield Construction Company (GC), the city’s Capital Projects unit (project manager), and Fleisher Ridout Partnership (landscape architect).
Related Stories
Sports and Recreational Facilities | Apr 27, 2022
New Univ. of Texas Moody Center houses men’s and women’s basketball, other events
The recently completed 530,000 sf University of Texas Moody Center is the new home for men’s and women’s basketball at the Austin campus.
Multifamily Housing | Apr 26, 2022
Fitness centers for multifamily housing: Advice from 'Dr. Fitness,' Karl Smith
In this episode for HorizonTV, Cortland's Karl Smith shares best practices for designing, siting, and operating fitness centers in apartment communities.
Sports and Recreational Facilities | Apr 25, 2022
Iowa's Field of Dreams to get boutique hotel, new baseball fields
A decade ago, Go the Distance Baseball formed to preserve the Iowa farm site where the 1989 movie Field of Dreams was filmed.
Projects | Apr 5, 2022
San Francisco Giants open new training facility in Phoenix
The new San Francisco Giants Player Development Center at Papago Park in Phoenix, Ariz., includes a first-of-its-kind space for Major League Baseball training facilities: an indoor half field.
Projects | Mar 22, 2022
AREA15 to open second location in Orlando, Florida
AREA15, an immersive and experiential art, entertainment, dining and retail center, recently announced that it will open its second location in Orlando, Florida, in 2024.
Sports and Recreational Facilities | Feb 3, 2022
Populous designs two new venues for Birmingham
Global design firm Populous collaborated with the Birmingham Jefferson Convention Center to open two new venues in Birmingham, Alabama this past Fall. Both venues are located in Birmingham’s downtown area, and are a part of the Birmingham Jefferson Convention Complex (BJCC).
Sponsored | Steel Buildings | Jan 25, 2022
Structural Game Changer: Winning solution for curved-wall gymnasium design
Sports and Recreational Facilities | Dec 15, 2021
Trends in sports stadium construction, with Turner Construction's Dewey Newton
Turner Construction's Dewey Newton discusses trends in sports stadium renovation and construction with BD+C's John Caulfield. Newton is a Senior Vice President who heads up Turner Construction’s Sports Group.
Giants 400 | Oct 22, 2021
2021 Sports Facilities Giants: Top architecture, engineering, and construction firms in the U.S. sports and recreation facility sector
AECOM, Populous, Kimley-Horn, and HOK top BD+C's rankings of the nation's largest sports and recreation facility sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.
Sports and Recreational Facilities | Sep 30, 2021
Experiential sportsman’s club set to open in Lakewood, Colo.
Nadel Architecture designed the project.