flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New renderings of the 1966 Century Plaza Hotel’s redevelopment

Hotel Facilities

New renderings of the 1966 Century Plaza Hotel’s redevelopment

The redevelopment project got underway last summer and is expected to be completed in 2018.


By David Malone, Associate Editor | January 30, 2017

Rendering courtesy of DBOX

Originally constructed in 1966, the Century Plaza Hotel is in the process of undergoing a redevelopment that will refurbish the hotel, eliminate about half of its 726 rooms, and add 63 residences. The space gained from eliminating a good portion of the rooms will be used to create 93,000 sf of commercial space on the hotel’s lower levels. 400 hotel rooms will remain on the upper floors.

Gensler is handling the interior renovation of the Century Plaza Hotel and Fairmont Hotels will operate it when completed. Fairmont is known for operating many luxury and historic hotels around the world.

The hotel redevelopment is part of the larger $2.5 billion Century Plaza project in Century City, Curbed Los Angeles reports. As part of this larger project, two new 46-story residential towers will rise behind the hotel. The towers, designed by Pei Cobb Freed, will have a combined total of 300 condominiums.

The Century Plaza project will also include a public, outdoor garden designed by Rios Clementi hale Studios, shops, and restaurants.

 

Rendering courtesy of DBOX.

 

Rendering courtesy of DBOX.

 

Rendering courtesy of DBOX.

Related Stories

Modular Building | Feb 1, 2016

Hotel developers turn to modular construction to meet demand

A $90 million rebuilding project in Yellowstone National Park exemplifies this trend.

Casinos | Jan 30, 2016

Boston ends its opposition to a casino, Wynn to build $1.7B resort

A judge’s ruling last year paved the way for Wynn Resorts to begin construction on a 33-acre gambling palace in Everett, Mass. 

Resort Design | Jan 26, 2016

Atlantis planning to build the world’s most expensive resort in Hawaii

The project was first announced in 2005 but has progressed little since.

Hotel Facilities | Jan 19, 2016

8 trends sparking the hospitality sector

Hotels and restaurants are branching out to attract more customers—and hold onto them longer. 

| Jan 14, 2016

How to succeed with EIFS: exterior insulation and finish systems

This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.

Hotel Facilities | Jan 13, 2016

Hotel construction should remain strong through 2017

More than 100,000 rooms could be delivered this year alone.

Urban Planning | Jan 4, 2016

The next boomtown? Construction and redevelopment sizzle in San Diego

The city's emission-reduction plan could drive influx into downtown

Hotel Facilities | Dec 14, 2015

Greater Fort Lauderdale is enjoying a building boom

This business-friendly South Florida market has several large hotel and multifamily projects in construction.

Greenbuild Report | Dec 14, 2015

Sensible sustainability: The new standard for hotels

In October 2008, The Proximity, a 147-room hotel in Greensboro, N.C., became the first LEED Platinum–certified hotel in the U.S. Since then, only two other hotels have earned LEED Platinum.

Multifamily Housing | Dec 7, 2015

Are long-term apartment rentals Airbnb’s next target?

Some developers are thinking about that possibility, says one West Coast real estate consultant. 

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021