flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New resort will be carved directly into a mountainside

Hotel Facilities

New resort will be carved directly into a mountainside

The project is is located in western Saudi Arabia.


By David Malone, Managing Editor | September 27, 2021
Desert Rock resort
Image courtesy Luxigon

A new resort has broken ground in Saudi Arabia with the goal of redefining the concept of sustainable architecture. Dubbed Desert Rock, the project is the first inland resort of The Red Sea Project, a destination comprising 50 resorts, 8,000 hotel rooms, and 1,000 residential properties across 22 islands and six inland sites.

The resort will not be built on a mountainside but will instead be carved directly into the ancient rock itself. The materials removed to carve into the site will then be reused to create the resort’s infrastructure.

Aerial of Desert Rock in Saudi Arabia
Image courtesy Luxigon.

The ground stone and existing sand will be used for concrete aggregate, which will be the main building material for all the architecture. Using the excavated material to build the project will ensure that it will have the same integral colors as the surrounding landscape, further immersing the architecture in its setting. Water retention and distribution systems will be used throughout the site, with harvested rainwater used to create a more green, flourishing wadi.

Desert Rock suite
Image courtesy Luxigon.

Desert Rock will feature 48 luxury villas and 12 hotel rooms that all offer panoramic views of the surrounding desert. A range of accommodation will be available, from ground level dwellings to crevice hotel suites midway up the mountain. A select number of excavated rooms will be located within the rock massif itself.

Resort amenities will include a spa and fitness center, remote destination dining areas, and a feature lagoon oasis. Guests will be able to hike, use dune buggies, and star gaze as part of the site-wide activities program.

Oppenheim Architecture designed the project. The Red Sea Development Company is the developer. Desert Rock is slated to welcome its first guests by the end of 2022.

View from Desert Rock suite
Image courtesy Luxigon.
Desert rock interior ensuite
Image courtesy Luxigon.
Desert Rock full resort
Image courtesy Luxigon.

 

Related Stories

| Sep 4, 2013

Smart building technology: Talking results at the BUILDINGChicago/ Greening the Heartland show

Recent advancements in technology are allowing owners to connect with facilities as never before, leveraging existing automation systems to achieve cost-effective energy improvements. This BUILDINGChicago presentation will feature Procter & Gamble’s smart building management program. 

| Aug 30, 2013

A new approach to post-occupancy evaluations

As a growing number of healthcare institutions become more customer-focused, post-occupancy evaluations (POE) are playing a bigger role in new construction and renovation projects. Advocate Health Care is among the healthcare organizations to institute a detailed post-occupancy assessment process for its projects. 

| Aug 26, 2013

What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets

BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets. 

| Aug 22, 2013

Energy-efficient glazing technology [AIA Course]

This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.

| Aug 14, 2013

Green Building Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest green design and construction firms. 

| Jul 31, 2013

Hotel, retail sectors bright spots of sluggish nonresidential construction market

A disappointing recovery of the U.S. economy is limiting need for new nonresidential building activity, said AIA Chief Economist, Kermit Baker in the AIA's semi-annual Consensus Construction Forecast, released today. As a result, AIA reduced its projections for 2013 spending to 2.3%.

| Jul 30, 2013

Better planning and delivery sought for VA healthcare facilities

Making Veterans Administration healthcare projects “better planned, better delivered” is the new goal of the VA’s Office of Construction and Facilities Management.

| Jul 30, 2013

Healthcare designers get an earful about controlling medical costs

At the current pace, in 2020 the U.S. will spend $4.2 trillion a year on healthcare; unchecked, waste would hit $1.2 trillion. Yet “waste” is keeping a lot of poorly performing hospitals in business, said healthcare facility experts at the recent American College of Healthcare Architects/AIA Academy of Architecture for Health Summer Leadership Summit in Chicago. 

| Jul 22, 2013

Top Hotel Construction Firms [2013 Giants 300 Report]

Manhattan Construction, Structure Tone, Lend Lease top Building Design+Construction's 2013 ranking of the largest hotel contractors and construction management firms in the U.S.

| Jul 22, 2013

Top Hotel Engineering Firms [2013 Giants 300 Report]

AECOM, Parsons Brinckerhoff, Buro Happold top Building Design+Construction's 2013 ranking of the largest hotel engineering and engineering/architecture firms in the U.S.

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021