flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New surgical tower enhances healthcare services of a Long Island, N.Y., hospital

Healthcare Facilities

New surgical tower enhances healthcare services of a Long Island, N.Y., hospital

The eight-story Petrocelli Surgical Pavilion includes 132 intensive care rooms.


By John Caulfield, Senior Editor | February 6, 2024
The eight-story Petrocelli Surgical Pavilion is attached to North Shore University hospital.
The new 288,000-sf Petrocelli Surgical Pavilion is attached to North Shore University Hospital, which opened its doors 70 years ago. Images: Bernstein Associates

A building team that included the construction and development firm Skanska USA Building has completed Petrocelli Surgical Pavilion at North Shore University Hospital in Manhasset, N.Y.

North Shore is affiliated with Northwell Health, the largest healthcare provider in New York State, which invested $560 million to build the 288,000-sf pavilion tower that features 18 operating rooms (three of which are hybrid rooms with advanced imaging), and 132 intensive care rooms. This project upgrades and expands the hospital’s critical care capabilities; patients will relocate to the new critical care units, and surgeries are scheduled to begin there later this month.

The pavilion will also be new home to the Sandra Atlas Bass Heart Hospital (which had been in the existing facility), and feature a concierge entrance for cardiac patients and their families. (North Shore University Hospital delivered more cardiac care than any other healthcare system in New York State in 2022, with 660,000 ambulatory visits, 38,000 inpatient discharges, 8,700 coronary interventions, 3,900 thoracic surgeries, 3,300 cardiac surgeries, and 2,800 cardiac ablations.)

The new eight-story pavilion should also enhance the hospital’s robust heart, liver, and lung transplant programs, as well as Northwell’s academic neurosurgery department, one of the largest in the nation. The pavilion is projected to perform 2,000 of the department’s annual cases.

Project took nearly four years to complete

One of 18 operating rooms in the new tower.
The Petrocelli Surgical Pavilion has 18 operating rooms, three with advanced imaging capabilities.

Skanska USA broke ground on the Petrocelli Surgical Pavilion in April 2020. The firm deployed numerous construction technologies, including drones equipped with high-res cameras and sensors to track construction progress and site conditions. Progress with also assessed using 3D modeling and weekly 360-degree image and video capture.

“The state-of-the-art Petrocelli Surgical Pavilion will significantly augment Northwell’s ability to provide its top-ranked care to patients on Long Island,” said Sean Szatkowski, Executive Vice President and General Manager for Skanska USA Building, in a prepared statement.

CannonDesign provided architectural services for the Pavilion project. Thornton Tomasetti was the structural engineer, BR+A Consulting Engineers the MEP engineer, and Vanasse Hangen Brustlin (VHB) the civil engineer.

Related Stories

Healthcare Facilities | May 28, 2024

Healthcare design: How to improve the parking experience for patients and families

Parking is likely a patient’s—and their families—first and last touch with a healthcare facility. As such, the arrival and departure parking experience can have a profound impact on their experience with the healthcare facility, writes Beth Bryan, PE, PTOE, PTP, STP2, Principal, Project Manager, Walter P Moore.

MFPRO+ News | May 21, 2024

Baker Barrios Architects announces new leadership roles for multifamily, healthcare design

Baker Barrios Architects announced two new additions to its leadership: Chris Powers, RA, AIA, NCARB, EDAC, as Associate Principal and Director (Healthcare); and Mark Kluemper, AIA, NCARB, as Associate Principal and Technical Director (Multifamily).

Healthcare Facilities | May 21, 2024

A collaborative delivery contract adds a new wrinkle to construction management

The setup combines traditional pact structures with a different risk-sharing approach.

Healthcare Facilities | May 6, 2024

Hospital construction costs for 2024

Data from Gordian breaks down the average cost per square foot for a three-story hospital across 10 U.S. cities.

Sponsored | Healthcare Facilities | May 3, 2024

Advancing Healthcare: Medical Office Buildings at the Forefront of Access and Safety

This article explores the pivotal shift from traditional hospital settings to Medical Office Buildings (MOBs), focusing on how these facilities enhance patient access. Discover the key drivers of this transformation, including technological advancements, demographic trends, and a growing emphasis on integrated, patient-centered care. Learn how MOBs are not only adapting to modern healthcare demands but are also leveraging modern access control and safety innovations.

Architects | May 2, 2024

Emerging considerations in inclusive design

Design elements that consider a diverse population of users make lives better. When it comes to wayfinding, some factors will remain consistent—including accessibility and legibility.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Healthcare Facilities | Apr 11, 2024

The just cause in behavioral health design: Make it right

NAC Architecture shares strategies for approaching behavioral health design collaboratively and thoughtfully, rather than simply applying a set of blanket rules.

Healthcare Facilities | Apr 3, 2024

Foster + Partners, CannonDesign unveil design for Mayo Clinic campus expansion

A redesign of the Mayo Clinic’s downtown campus in Rochester, Minn., centers around two new clinical high-rise buildings. The two nine-story structures will reach a height of 221 feet, with the potential to expand to 420 feet.

Products and Materials | Mar 31, 2024

Top building products for March 2024

BD+C Editors break down March's top 15 building products, from multifamily-focused electronic locks to recyclable plastic panels.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021