flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New technologies and techniques can ‘future-proof’ buildings

Codes and Standards

New technologies and techniques can ‘future-proof’ buildings

Net-zero principles may give buildings longer lives.


By Peter Fabris, Contributing Editor | October 21, 2020

Courtesy Pixabay

With the number of extreme weather events on the rise, and the possibility that the cost of powering a building with fossil fuels rising as governments aim to combat climate change, net-zero construction could provide future-proofing qualities.

Construction using leading-edge techniques today will result in longer-lasting structures, the reasoning goes. For instance, a home battery system may become more desirable for backup power with more grid outages due to storms and wildfires. Installing them now in new construction would make these buildings more desirable—especially in the long run.

An affordable housing project that tightly seals the building and packs the walls with an extra thick layer of insulation greatly reduces residents’ heating and cooling expenses, improving their financial resiliency. Heat pumps can provide efficient room heating and water heating. These measures create further savings that will make the building more desirable for tenants for many years.

Figuring out the angle of the sun on August afternoons and designing shades that block it then, but also allow sunlight in when it is at a lower angle in the sky in the winter further bolsters energy efficiency.

Related Stories

| May 3, 2012

Green-roof requirement now includes industrial facilities in Toronto

A mandate that requires installation of green roofs on new commercial and residential buildings in Toronto has been expanded to include industrial facilities.

| May 3, 2012

Innovative wastewater treatment helps achieve LEED rating

LEED for New Construction, Neighborhood Development and the LEED Volume Program offer some ways to achieve LEED points when dealing with wastewater treatment.

| Apr 26, 2012

Lack of bolts on steel support caused collapse at Cincinnati casino

Too few bolts connecting horizontal steel support beams with vertical steel columns was the cause of January’s construction accident at Horseshoe Casino Cincinnati, according to the report of the Occupational Safety and Health Administration.

| Apr 26, 2012

OSHA criticized for taking too long to roll out safety rules

The Occupational Safety and Health Administration takes far too long to adopt new safety regulations compared to other agencies’ development of rules, safety experts said during a Senate hearing.

| Apr 26, 2012

Contractors fear that GSA scandal will lead to fewer federal construction contracts

In the wake of the recent scandal at the General Services Administration in which workers spent lavishly at a Las Vegas conference, a spokesman for Associated General Contractors of America said contractors are worried the scandal will result in cuts to GSA's construction and renovation budgets.

| Apr 26, 2012

Developers can use LEED wastewater credits to help gain approvals in environmentally sensitive locales

Those wanting to pursue development in heavily regulated and environmentally sensitive areas are benefiting by designing projects that qualify for LEED points, even if the project as a whole does not achieve certification.

| Apr 26, 2012

New York City Council moves to license elevator mechanics

New York’s City Council introduced a measure last week that would require the city’s 7,000 elevator mechanics to meet national standards and be licensed by the city.

| Apr 23, 2012

AAMA releases updated specification for anodized aluminum

AAMA 611-12 describes test procedures and requirements for high performance (Class I) and commercial (Class II) architectural quality aluminum oxide coatings applied to aluminum extrusions and panels for architectural products.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021