flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A new Times Square hotel positions itself as a resort

Hotel Facilities

A new Times Square hotel positions itself as a resort

Margaritaville Resort arrives as New York City considers creating entertainment districts.


By John Caufield, Senior Editor | July 20, 2021
The heated pool on Margaritaville Resort's fourth floor
The heated pool on Margaritaville Resort's fourth floor

There are many beaches in New York City, including Jones Beach State Park, Coney Island, Manhattan Beach, Brighton Beach, The People’s Beach at Jacob Riis Park, Times Square …

Wait. What?

Surrounded by buildings, asphalt, concrete, and enough exterior lighting to throw off anyone’s circadian rhythm, Times Square is rarely mistaken as a place to go for relaxation. But a team of developers led by Margaritaville Hospitality Group and Soho Properties is marketing the newly opened Margaritaville Resort Times Square, located at 7th Avenue and 40th Street, as a vertical version of a vacation getaway.

This is the first of 22 Margaritaville lodging venues that isn’t horizontal.  The $370 million, 32-story hotel, rising 375 ft above street level, offers 234 rooms and five restaurants. To give the hotel its resort feel, the developers brought in The McBride Company as its interior designer. McBride has done the interiors for numerous other Margaritaville venues.

Outside one of the hotel’s restaurants, the Landshark Bar & Grill, is Times Square’s only heated year-round outdoor pool. And the building’s architectural design, by the firm Stonehill Taylor, maximizes guests’ and visitors’ views of the city.

“We don’t have a beach, but we have Times Square,” says Paul Taylor, President and Founding Partner at Stonehill Taylor, whom BD+C interviewed with the firm’s Senior Associate Steve Chew.

 

HOTEL SITS IN TWO ZONING AREAS

A view from one of the hotel's 234 rooms

The views from the hotel's 234 rooms maximize the cityscape. Image: Margaritaville Resort

 

Stonehill Taylor has been involved in at least 70 hotel projects in New York since the firm’s founding in 1986. Its design of the Margaritaville Resort began in 2014, and construction, by Flintlock Construction Services, commenced three years later.

Other building team members on this hotel project included WSP (SE and MEP), Frank Seta & Associates (façade), Jenkins & Huntington (elevator), URS (civil/geotech), and Longman Linsey (acoustics). The project's construction cost was $98 million.

The Margaritaville Resort posed some unique challenges. For one thing, the hotel—which replaces a six-story building that housed the former campus for the Parsons School of Design and a synagogue—sits between two zoning districts, so the hotel’s exterior lighting is limited, explains Chew. (Reveal Design Group was the lighting provider on this project.) In addition, the real estate footprint for this building is relatively small—9,886 sf.

To call attention to the hotel, the team incorporated a 32-ft-tall replica of the Statue of Liberty (hoisting a margarita glass, of course) into the building’s design. A five-story stairwell (an improvisation to offset some setback and street wall requirements) allows pedestrians to see up to the pool and deck on the fourth floor. The hotel’s rooftop, and several of its rooms, give guests and visitors a perfect view of the New Year’s Eve ball dropping.

One of the hotel's five restaurants

The hotel has one of the city's largest food & beverage operations. Image: Margaritaville Resort

 

Taylor notes that the building team completed this project during the coronavirus pandemic and restrictive COVID-19 jobsite protocols. “This was a new experience for us,” he says. Taylor adds that none of the hotel’s five restaurants are on its first floor, bucking what had been conventional wisdom about where hotel food and beverage venues needed to be located to be successful.

Margaritaville Resort includes nearly 5,000 sf of retail space. The ground-floor retail features 22-ft-tall ceilings. (IMCMV Holdings is the developer for the hotel’s retail and F&B spaces.) The hotel’s first floor is also the entrance to a replacement synagogue (whose reconstruction was part of the property acquisition deal) that is located on two below-street level floors.

Margaritaville Resort Times Square opened at a time when, as reported in the New York Post, the city’s Office of Nightlife has proposed creating 24-hour “entertainment districts” that would open up certain neighborhoods, possibly including Times Square, for 24/7 revelry that could contribute to the hotel’s resort atmosphere.

Related Stories

| Oct 31, 2014

Dubai plans world’s next tallest towers

Emaar Properties has unveiled plans for a new project containing two towers that will top the charts in height, making them the world’s tallest towers once completed.

| Oct 30, 2014

New hotel to be developed at future Dallas Cowboys World Headquarters

The Omni property will be one of the only full-service upscale hotels in the area, and serve as a cornerstone of the mixed-use development, which will be anchored by the Dallas Cowboys World Headquarters and Frisco’s Multi-Use Event Center.

| Oct 29, 2014

Better guidance for appraising green buildings is steadily emerging

The Appraisal Foundation is striving to improve appraisers’ understanding of green valuation.

| Oct 22, 2014

Must see: Tilted cube concept for mountainside lodge in Slovakia

The tilted-cube design was designed to visually disorient the viewer and create visual lightness in the harsh landscape. In a sense, the concept was intended to evoke a boulder resting on the mountainside. 

| Oct 21, 2014

Norman Foster, Zaha Hadid release plans for resorts in Nanjing and Wuhan, China

Jumeirah Group, a hotel group forming a part of investment group Dubai Holding, has chosen Zaha Hadid and Norman Foster to design two of three of its proposed resorts in Nanjing, Wuhan, and Haikou.

| Oct 16, 2014

Perkins+Will white paper examines alternatives to flame retardant building materials

The white paper includes a list of 193 flame retardants, including 29 discovered in building and household products, 50 found in the indoor environment, and 33 in human blood, milk, and tissues.

| Oct 15, 2014

Harvard launches ‘design-centric’ center for green buildings and cities

The impetus behind Harvard's Center for Green Buildings and Cities is what the design school’s dean, Mohsen Mostafavi, describes as a “rapidly urbanizing global economy,” in which cities are building new structures “on a massive scale.” 

| Oct 15, 2014

Hilton launches boutique hotel chain

The Canopy by Hilton brand will feature the personality of nearby neighborhoods, using locally sourced food and art, and incorporate the latest technologies, like phone-based room keys. 

| Oct 12, 2014

AIA 2030 commitment: Five years on, are we any closer to net-zero?

This year marks the fifth anniversary of the American Institute of Architects’ effort to have architecture firms voluntarily pledge net-zero energy design for all their buildings by 2030. 

| Oct 3, 2014

Herzog & de Meuron unveil design for Manhattan hotel-condo tower [slideshow]

Herzog & de Meuron will partner with interior designer John Pawson to design a 28-story tower for Manhattan's Bowery district. The majority of the building will house a 370-room hotel, with 11 luxury residences on its top. 

boombox1
boombox2
native1

More In Category

3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021