flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New tool helps developers, contractors identify geographic risk for construction

New tool helps developers, contractors identify geographic risk for construction

Interactive tool from Aon Risk Solutions points out potential legal, insurance, and catastrophic exposure roadblocks


By John Caulfield, Senior Editor | November 18, 2014
An example of Aons Construction Risk Map, which the portal updates regularly to
An example of Aons Construction Risk Map, which the portal updates regularly to provide clients with insights into where the bu

Developers and contractors entering new markets that are looking to mitigate their projects’ risk now have available an interactive tool that not only allows them to access real-time updates pertaining to the risk climate of municipalities across the U.S., but also to create a job-specific risk profile that takes into account such factors as local statutes and the potential for catastrophic exposure.

Aon Risk Solutions, through its Construction Services Group, has gone live with its Construction Risk Portal, a web-enhanced tool that helps clients navigate risk when working across multiple geographies simultaneously.

Aon Risk Solutions is a division of London-based Aon plc, a publicly traded global provider of risk management, insurance and reinsurance brokerage, and human resources solutions and outsourcing services. It has clients in 120 countries.

The portal is a single website with two applications:

• Construction Risk Map is a searchable reference library. It provides a macroeconomic vantage of the construction risk climate across the country, and outlines specific issues—such as litigation, legislation, and insurance requirements—that contribute to overall construction’s risk rating;

• Construction Risk Register is an interactive module through which users can create project- and location-specific risk profiles based on data about the project. The profile would have three components: State-specific statutes and case law based on construction-specific issues as tracked in the Construction Risk Map; a map that plots a project’s location based on information input and through a partnership with Aon Benfield’s Impact Forecasting capabilities and analysis of catastrophic exposure; and a risk “matrix” that plots the potential severity of jurisdictional issues and catastrophic exposures on a construction project.

Aon Risk Solutions developed this interactive platform with assistance from Johnson & Bell, a real estate and construction litigation firm, and one of several information partners with which Aon has on retainer. 

“The Construction Risk Portal will allow our clients and colleagues to have access 24-hours a day, seven days a week to statutory developments, case law, risk trends and regulatory updates,” says Matt Walsh, Executive Vice President and Chief Broking Officer of Aon Risk Solutions’ Construction Services Group. 

Aon now includes access to this portal as one of the services it offers to clients, says Walsh. The plan is to add other applications in 2015, which Walsh says could revolve around safety drivers, contractual issues, and information about risks in other countries, such as Canada. 

Related Stories

| Aug 11, 2010

Gensler, HOK, HDR among the nation's leading reconstruction design firms, according to BD+C's Giants 300 report

A ranking of the Top 100 Reconstruction Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Gensler, Arup, HOK among the largest office sector design firms

A ranking of the Top 100 Office Design firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Callison strengthens retail design presence with RYA acquisition

Callison LLC on June 1 acquired RYA Design Consultancy, a Dallas-based retail architecture and design firm with offices in New York City. The new “Callison RYA Studio” will merge staff and clients into Callison ’s existing retail practice at their Dallas and New York offices.

| Aug 11, 2010

Prism-shaped design unveiled for five-star hotel in Saudi Arabia

Goettsch Partners has been commissioned by Saudi Oger Ltd. to design a new five-star, 214-key business hotel in the King Abdullah Financial District in Riyadh, Saudi Arabia. As a design-build assignment, Saudi Oger is serving as the contractor, selected by developer Rayadah Investment Company. The project is sited on Parcel 1.08, one of the first 10 parcels currently under development in the massive new master-planned district.

| Aug 11, 2010

Construction Specifications Institute to end support of MasterFormat 95 on December 31, 2009

The Construction Specifications Institute (CSI) announced that the organization will cease to license and support MasterFormat 95 as of December 31, 2009. The CSI Board of Directors voted to stop licensing and supporting MasterFormat 95 during its June 16, 2009, meeting at the CSI Annual Convention in Indianapolis.

| Aug 11, 2010

Gensler among eight teams named finalists in 'classroom of the future' design competition

Eight teams were recognized today as finalists of the 2009 Open Architecture Challenge: Classroom. Finalists submitted designs ranging from an outdoor classroom for children in inner-city Chicago, learning spaces for the children of salt pan workers in India, safe spaces for youth in Bogota, Colombia and a bamboo classroom in the Himalayan mountains.

| Aug 11, 2010

F&S Partners merges with SmithGroup

F&S Partners, a Dallas architecture firm specializing in the design of educational, recreational, and religious projects, has merged with SmithGroup, a top 10 U.S. architecture/engineering firm. The 40-person office in Dallas will carry the name SmithGroup/F&S.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021