flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New University of St. Thomas sports arena will support school's move to Division I athletics

Sports and Recreational Facilities

New University of St. Thomas sports arena will support school's move to Division I athletics

The multipurpose facility will be new home for school’s men’s and women’s hockey, basketball.


By Peter Fabris, Contributing Editor | March 30, 2023
University of St. Thomas Lee and Penny Anderson Arena Renderings courtesy Ryan Companies, Crawford Architects 2023_0111 - Hockey_Final_V3.jpg
Rendering of the University of St. Thomas's Lee and Penny Anderson Arena. All renderings courtesy Ryan Companies US

In 2021, the University of St. Thomas in Saint Paul, Minn., became the first Division III institution in the modern NCAA to transition directly to Division I. Plans for a new multipurpose sports arena on campus will support that move.

The Lee and Penny Anderson Arena project, including practice facilities, will serve as the new home for the school’s men’s and women’s hockey and basketball programs. It is scheduled to break ground in 2024, with a target opening in fall 2025.

Ryan Companies US, Inc., was selected as the design-builder, in partnership with Crawford Architects. The new arena complex will provide competition and training facilities for men’s and women’s athletics, and house commencement ceremonies, academic convocations, conferences, career fairs, and other events for the university and broader community.

Preliminary design concepts envision seating configurations that accommodate quick conversions between various athletic and university events. Spectators will be on top of the action, as intimate seating and balconies will create a home-team advantage that will enhance the game-day experience for players and fans.

University of St. Thomas Lee and Penny Anderson Arena Renderings courtesy Ryan Companies, Crawford Architects North Quadrangle Day View
North quadrangle day view

The exterior design of the sports arena will represent an intersection of the school’s collegiate Gothic architecture and a more modern aesthetic. LEED Silver certification will be pursued.

“St. Thomas has been evolving from small Catholic liberal arts college to a comprehensive national Catholic university, and the Lee and Penny Anderson Arena will be a powerful engine for that journey,” said St. Thomas President Rob Vischer.

The university recently announced that it received a $75 million gift from Lee and Penny Anderson of Naples, Fla., for the arena. The donation is the single largest monetary gift ever given to a Minnesota university.

On the building team: 
Owner: University of St. Thomas, St. Paul, Minn.
Design architect: Ryan A+E, Inc. (design studio of Ryan Companies US, Inc.)
Sports architect: Crawford Architects
MEP engineer: IMEG
Structural engineer: Meyer Borgman Johnson
General contractor: Ryan Companies US, Inc.

University of St. Thomas Lee and Penny Anderson Arena Renderings courtesy Ryan Companies, Crawford Architects St. Thomas - Basketball Practice Facility
Basketball practice facility
University of St. Thomas Lee and Penny Anderson Arena Renderings courtesy Ryan Companies, Crawford Architects Basketball
Basketball arena 
University of St. Thomas Lee and Penny Anderson Arena Renderings courtesy Ryan Companies, Crawford Architects - Graduation ceremony
Graduation ceremony
University of St. Thomas Lee and Penny Anderson Arena Renderings courtesy Ryan Companies, Crawford Architects Auxiliary Ice Arena
Auxiliary ice arena
University of St. Thomas Lee and Penny Anderson Arena Renderings courtesy Ryan Companies, Crawford Architects Enlarged Site Plan
Site Plan
University of St. Thomas Lee and Penny Anderson Arena Renderings courtesy Ryan Companies, Crawford Architects Fireplace Gameday View
Gameday view
University of St. Thomas Lee and Penny Anderson Arena Renderings courtesy Ryan Companies, Crawford Architects Tower Entry Winter View
Tower entry winter view
University of St. Thomas Lee and Penny Anderson Arena Renderings courtesy Ryan Companies, Crawford Architects North Quadrangle Night View
North quadrangle night view
University of St. Thomas Lee and Penny Anderson Arena Renderings courtesy Ryan Companies, Crawford Architects Grand Avenue Entry View
Grand Avenue entry view

 

 

 

 

Related Stories

| Dec 31, 2013

Top 10 blog posts from 2013

BD+C editors and our contributors posted hundreds of blogs in 2013. Here's a recap of the most popular topics. They include valuable lessons from one of the first BIM-related lawsuits and sage advice from AEC legend Arthur Gensler.  

| Dec 13, 2013

Safe and sound: 10 solutions for fire and life safety

From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies. 

| Dec 10, 2013

16 great solutions for architects, engineers, and contractors

From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.

| Dec 3, 2013

Historic Daytona International Speedway undergoing $400 million facelift

The Daytona International Speedway is zooming ahead on the largest renovation in the Florida venue’s 54-year history. Improvements include five redesigned guest entrances, an extended grandstand with 101,000 new seats, and more than 60 new trackside suites for corporate entertaining.

| Nov 27, 2013

Wonder walls: 13 choices for the building envelope

BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina. 

| Nov 26, 2013

Video: Zaha Hadid's stadium for Qatar 2022 World Cup

Zaha Hadid Architects, in conjunction with AECOM, has released renderings for a major stadium being designed for the Qatar 2022 FIFA World Cup--an event that will involve up to nine stadiums.

| Nov 26, 2013

Construction costs rise for 22nd straight month in November

Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.

| Nov 25, 2013

Building Teams need to help owners avoid 'operational stray'

"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.

| Nov 19, 2013

Top 10 green building products for 2014

Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list. 

| Nov 15, 2013

Metal makes its mark on interior spaces

Beyond its long-standing role as a preferred material for a building’s structure and roof, metal is making its mark on interior spaces as well. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021