In 2021, the University of St. Thomas in Saint Paul, Minn., became the first Division III institution in the modern NCAA to transition directly to Division I. Plans for a new multipurpose sports arena on campus will support that move.
The Lee and Penny Anderson Arena project, including practice facilities, will serve as the new home for the school’s men’s and women’s hockey and basketball programs. It is scheduled to break ground in 2024, with a target opening in fall 2025.
Ryan Companies US, Inc., was selected as the design-builder, in partnership with Crawford Architects. The new arena complex will provide competition and training facilities for men’s and women’s athletics, and house commencement ceremonies, academic convocations, conferences, career fairs, and other events for the university and broader community.
Preliminary design concepts envision seating configurations that accommodate quick conversions between various athletic and university events. Spectators will be on top of the action, as intimate seating and balconies will create a home-team advantage that will enhance the game-day experience for players and fans.

The exterior design of the sports arena will represent an intersection of the school’s collegiate Gothic architecture and a more modern aesthetic. LEED Silver certification will be pursued.
“St. Thomas has been evolving from small Catholic liberal arts college to a comprehensive national Catholic university, and the Lee and Penny Anderson Arena will be a powerful engine for that journey,” said St. Thomas President Rob Vischer.
The university recently announced that it received a $75 million gift from Lee and Penny Anderson of Naples, Fla., for the arena. The donation is the single largest monetary gift ever given to a Minnesota university.
On the building team:
Owner: University of St. Thomas, St. Paul, Minn.
Design architect: Ryan A+E, Inc. (design studio of Ryan Companies US, Inc.)
Sports architect: Crawford Architects
MEP engineer: IMEG
Structural engineer: Meyer Borgman Johnson
General contractor: Ryan Companies US, Inc.









Related Stories
| Aug 11, 2010
Nurturing the Community
The best seat in the house at the new Seahawks Stadium in Seattle isn't on the 50-yard line. It's in the southeast corner, at the very top of the upper bowl. "From there you have a corner-to-corner view of the field and an inspiring grasp of the surrounding city," says Kelly Kerns, project leader with architect/engineer Ellerbe Becket, Kansas City, Mo.
| Aug 11, 2010
Financial Wizardry Builds a Community
At 69 square miles, Vineland is New Jersey's largest city, at least in geographic area, and it has a rich history. It was established in 1861 as a planned community (well before there were such things) by the utopian Charles Landis. It was in Vineland that Dr. Thomas Welch found a way to preserve grape juice without fermenting it, creating a wine substitute for church use (the town was dry).
| Aug 11, 2010
Integrated Project Delivery builds a brave, new BIM world
Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.
| Aug 11, 2010
Bronze Award: Alumni Gymnasium Renovation, Dartmouth College Hanover, N.H.
At a time when institutions of higher learning are spending tens of millions of dollars erecting massive, cutting-edge recreation and fitness centers, Dartmouth College in Hanover, N.H., decided to take a more modest, historical approach. Instead of building an ultra-grand new facility, the university chose to breathe new life into its landmark Alumni Gymnasium by transforming the outdated 99-y...