flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New ways to work with wood

New ways to work with wood

New products like cross-laminated timber are spurring interest in wood as a structural material.


By By Susan Bady, Contributing Editor | February 1, 2012
Wood columns made of parallel strand lumber support the steel roof and glass curtain wall of Arena Stage in Washington, D.C. The
This article first appeared in the February 2012 issue of BD+C.

Although wood is commonly used as a finish material in nonresidential buildings, more and more Building Teams are specifying wood as a structural material to accompany steel or concrete—or sometimes to be used entirely on its own. Recent studies show that wood offers such benefits as speed of construction, cost effectiveness, durability, and sustainability (see box, page 53). Structural wood products such as cross-laminated timber (CLT) and parallel strand lumber (PSL) are attracting the attention of architects, structural engineers, and contractors.

Research by the National Science Foundation and other partners on the performance of wood buildings during seismic events—the so-called NEESWood Capstone tests—is yielding promising results. For example, Japanese researchers built a seven-story wood-frame residential structure on a shake table and subjected it to Kobe-level earthquake conditions—6.9 on the Richter scale (see http://www.apawood.org/level_b.cfm?content=srv_newsinfo_34). “There was virtually no damage to the building,” says Dwight Yochim, national director of WoodWorks, an alliance of North American wood associations, headquartered in Vancouver, B.C.

Yochim says that one of the concerns with building with concrete or steel is the temptation to overbuild to compensate for the mass of the material itself. “Wood has many redundant connections and it’s light,” he says, “so when an earthquake hits, it doesn’t have the same impact on the building” as it would with a steel or concrete structure.

Yochim says some glulam manufacturers are adding steel straps to their beams to help carry the load over long spans. The Richmond Olympic Oval, built for the 2010 Winter Olympics in Vancouver, B.C., has a wood roof with a clear span of more than 300 feet. Part of the roof is constructed of double Douglas-fir glulam beams reinforced with steel straps.

“Wood is a viable building product and a good alternative to conventional construction,” says Blakely C. Dunn, AIA, NCARB, principal of CADM Architecture, El Dorado, Ark. “It’s easy to erect, and it’s easy to correct something that’s incorrect.” He notes that wood usually has a shorter lead time for delivery compared to other structural materials: “You don’t have to wait weeks for it to show up at the job site.”

Applications for structural wood expand

  • Architects and engineers are substituting wood framing for steel and concrete as a cost-saving measure.
  • Manufacturers are adding steel straps to glulam beams to help carry loads over long spans.
  • Cross-laminated timber is making its debut in the U.S. as an innovative framing material for buildings up to 10 stories in height.
  • Heavy-timber construction showcases the versatility, strength, and beauty of wood and can help keep projects on budget.

CROSS-LAMINATED TIMBER CROSSES THE POND
Cross-laminated timber has been widely used in Europe since the 1980s but is not well known in North America. CLT panels are manufactured by stacking multiple layers of wood, each about 20 to 38 millimeters in thickness, at right angles and gluing them together in a press. Typical widths are 0.6, 1.2, and 2.95 meters (up to 4 meters), in lengths up to 24 meters.

The cross-lamination process minimizes swelling and shrinkage and increases resistance. CLT panels are used for floor, wall, and roof systems. Pre-assembled wall sections can be lifted into place with cranes and attached to each other with screws or steel brackets.

“CLT competes head-to-head with concrete buildings up to six stories,” says Yochim. So far, the tallest CLT structure built in Europe is nine stories. Researchers in Austria are testing something called the life cycle tower, a combination of glulam beams, CLT, and concrete slabs that could go much higher. “They’re all prefabricated assemblies,” says Yochim. “Once you’ve got your foundation down, the rest of the building just bolts together.”

The first nonresidential CLT building to be constructed in the U.S., a 78-foot church bell tower, was completed in December 2010 in Gastonia, N.C. The tower has a 12x12-foot base and wood panels of varying lengths, which provide the strength and stability of concrete but are much lighter, says Michael DeVere, principal of MDS10 Architects, Asheville, N.C. The foundation is three feet deep.

To better analyze the stresses inflicted by wind and seismic loading and swinging bells, Medlock & Associates Engineering, Asheville, N.C., modeled the tower using RISA-3D design software. This enabled the engineers to keep the project within its $450,000 budget. For ease of assembly, they used a panelized system and kept connection variations to a minimum.

The panels were prefabricated in Austria, reducing the amount of on-site labor and virtually eliminating job-site waste. Tim Richards, vice president of general contractor M-Y Construction of Tryon, N.C., says a comparable steel structure would have taken three to four weeks to complete. With CLT, it took five-and-a-half days.

DeVere points out that CLT is also a green material, accounting for significantly less greenhouse gas emissions than concrete or steel. He also likes its creative nature. “It can free you from many of the constrictions of conventional construction,” he says. “Depending on the design, you can eliminate lintels and headers as well as columns and deep horizontal framing members.” Exterior wall panels distribute the bearing load evenly across the entire length, so most point loads can be dispersed, avoiding piers and pad footings and reducing the amount of concrete in the foundation.

“Some have described CLT as ‘Legos on steroids,’” says DeVere. “We see it as a game changer for the construction industry.” He and his business partner, Crawford Murphy, hope to open a CLT manufacturing facility in the U.S.

HEAVY TIMBER PLAYS LEAD ROLE IN THEATER
In British Columbia, the use of heavy timber in nonresidential projects is commonplace. But the concept raised eyebrows when first proposed for Arena Stage at the Mead Center for American Theater, in Washington, D.C.

“The local building authorities were skeptical at first about the use of timber for large institutional assembly buildings,” says Michael Heeney, MAIBC, FRAIC, LEED AP, principal of Bing Thom Architects, Vancouver, B.C. “They were concerned about flammability.” The firm and its fire engineers, LMDG, presented a fire report and char analysis which showed that the effects of a fire on the structure would be minimal. In fact, charring on the outside of the wood columns would actually protect the interior of the wood.

One of the project goals was to double the space of Arena Stage and the adjacent Kreeger Theater. There was no money in the budget for finishes, yet the structure had to be beautiful, so wood made perfect sense as both a structural and finish material. The architects wrapped the two theaters with an insulated glass wall, providing acoustic separation from nearby Reagan National Airport and highway traffic.

StructureCraft Builders, a specialty timber-frame design/builder based in Delta, B.C., crafted 18 giant columns out of parallel strand lumber (PSL) for the perimeter of the Arena Stage façade. The columns are unreinforced, solid engineered wood that use no internal steel support. Bing Thom Architects designed the kinds of connections used in a steel-frame building so that local steelworkers could install them.

“Wood is a very versatile material, but you need to spend time making the connections economical by encouraging as much repetition as possible,” says Heeney. “The PSL columns at Arena Stage connect to specially designed iron castings that would have been prohibitively expensive had we made only one.”

WOOD FRAMING SAVES $2.7 MILLION FOR SCHOOL
When the El Dorado (Ark.) School District needed a new high school for 1,600 students, the Building Team compared the cost of structural steel, precast concrete, and wood as a framing system.

Blake Dunn of CADM Architecture says the school’s construction budget was $134.78/sf. Had it been built with steel and masonry, the cost would have been $50/sf too high. Wood framing saved $2.7 million.

The original design intent—to use wood for exposed areas inside the building—was extended to concealed areas such as columns, beams, demising walls, office partitions, exterior walls, floors and roof systems. The structural components are predominately Southern yellow pine. Interior doors are maple; the paneling and trim are red oak. “The auditorium has large acoustical deflectors on the side walls that are made out of maple plywood,” he says. “They’re angled in such a way as to tune the space.” +

MORE ON THE BENEFITS OF STRUCTURAL WOOD
Science Supporting the Economic and Environmental Benefits of Using Wood and Wood Products in Green Building Construction,” Michael A. Ritter, Kenneth Skog, and Richard Bergman, USDA Forest Service.

Wood Products Used on the Construction of Low-Rise Nonresidential Buildings in the United States, 2008,” David B. McKeever, USDA Forest Service.

Maximizing Forest Contributions to Carbon Mitigation” (CORRIM Fact Sheet, March 2009).

Product and Process Environmental Improvement Analysis for Buildings (Carbon Life Cycle Assessment)” (CORRIM Fact Sheet, December 2009).

Related Stories

| Aug 11, 2010

Florida mixed-use complex includes retail, residential

The $325 million Atlantic Plaza II lifestyle center will be built on 8.5 acres in Delray Beach, Fla. Designed by Vander Ploeg & Associates, Boca Raton, the complex will include six buildings ranging from three to five stories and have 182,000 sf of restaurant and retail space. An additional 106,000 sf of Class A office space and a residential component including 197 apartments, townhouses, ...

| Aug 11, 2010

Restoration gives new life to New Formalism icon

The $30 million upgrade, restoration, and expansion of the Mark Taper Forum in Los Angeles was completed by the team of Rios Clementi Hale Studios (architect), Harley Ellis Devereaux (executive architect/MEP), KPFF (structural engineer), and Taisei Construction (GC). Work on the Welton Becket-designed 1967 complex included an overhaul of the auditorium, lighting, and acoustics.

| Aug 11, 2010

Best AEC Firms to Work For

2006 FreemanWhite Hnedak Bobo Group McCarthy Building Companies, Inc. Shawmut Design and Construction Walter P Moore 2007 Anshen+Allen Arup Bovis Lend Lease Cannon Design Jones Lang LaSalle Perkins+Will SmithGroup SSOE, Inc. Timothy Haahs & Associates, Inc. 2008 Gilbane Building Co. HDR KJWW Engineering Consultants Lord, Aeck & Sargent Mark G.

| Aug 11, 2010

High-Performance Workplaces

Building Teams around the world are finding that the workplace is changing radically, leading owners and tenants to reinvent corporate office buildings to compete more effectively on a global scale. The good news is that this means more renovation and reconstruction work at a time when new construction has stalled to a dribble.

| Aug 11, 2010

Great Solutions: Business Management

22. Commercial Properties Repositioned for University USE Tocci Building Companies is finding success in repositioning commercial properties for university use, and it expects the trend to continue. The firm's Capital Cove project in Providence, R.I., for instance, was originally designed by Elkus Manfredi (with design continued by HDS Architects) to be a mixed-use complex with private, market-...

| Aug 11, 2010

Nurturing the Community

The best seat in the house at the new Seahawks Stadium in Seattle isn't on the 50-yard line. It's in the southeast corner, at the very top of the upper bowl. "From there you have a corner-to-corner view of the field and an inspiring grasp of the surrounding city," says Kelly Kerns, project leader with architect/engineer Ellerbe Becket, Kansas City, Mo.

| Aug 11, 2010

AIA Course: Historic Masonry — Restoration and Renovation

Historic restoration and preservation efforts are accelerating throughout the U.S., thanks in part to available tax credits, awards programs, and green building trends. While these projects entail many different building components and systems, façade restoration—as the public face of these older structures—is a key focus. Earn 1.0 AIA learning unit by taking this free course from Building Design+Construction.

| Aug 11, 2010

BIM adoption tops 80% among the nation's largest AEC firms, according to BD+C's Giants 300 survey

The nation's largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction's premier Top 50 BIM Adopters ranking, published as part of the 2009 Giants 300 survey. Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, half have more than 30 seats, and near...

| Aug 11, 2010

World's tallest all-wood residential structure opens in London

At nine stories, the Stadthaus apartment complex in East London is the world’s tallest residential structure constructed entirely in timber and one of the tallest all-wood buildings on the planet. The tower’s structural system consists of cross-laminated timber (CLT) panels pieced together to form load-bearing walls and floors. Even the elevator and stair shafts are constructed of prefabricated CLT.

| Aug 11, 2010

Integrated Project Delivery builds a brave, new BIM world

Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021