flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New York City code update changes definition of a major building

Codes and Standards

New York City code update changes definition of a major building

Impacts how construction projects are permitted with major implications for contractors


By Peter Fabris, Contributing Editor | July 15, 2024
Image by Melissa Mahon from Pixabay

Image by Melissa Mahon from Pixabay

Changes affecting how construction projects in New York City are permitted will have significant impacts for contractors.

On Dec. 11, the definition of a major building in the city’s code will change from 10 stories to seven, or 75 feet. The change will affect thousands more projects.

It will require a site safety coordinator and an approved site safety plan for any major new build, full demolition, or interior demolition with mechanical equipment that is seven stories or higher. Contractors working on these major projects should hire professionals to assist them with navigating through the entire application, permit, certificate of occupancy, approval, and sign-off processes, advises a former New York Department of Buildings assistant commissioner. Contractors who have previously built only low-rise buildings should also hire a safety consultant to provide full-time safety professionals and obtain approvals for site safety plans and tenant protection plans, he says.

The code change includes a provision for construction superintendents to only be designated on three permits at one time. In January 2026, this number will be reduced to one permit. As a result, contractors should send their staff to obtain superintendent licenses and Supervisory SST training cards.

Related Stories

Codes and Standards | Oct 24, 2019

ASHRAE design contest winners demonstrate building resilience

Model building, a city hall, could operate without utility service for two weeks.

Codes and Standards | Oct 22, 2019

Efficient material design, low-carbon concrete are critical to cutting GHG emissions in construction

Enhancing building utilization and reusing materials also aid carbon reduction.

Codes and Standards | Oct 18, 2019

St. Louis could save $61 million per year in energy costs by improved building performance

GHG gases can be reduced by at least 11% with upgrades to public buildings and large private buildings.

Codes and Standards | Oct 17, 2019

Slow payments cost GCs and subs $64 billion annually

Study finds 51-day average payment turnaround.

Codes and Standards | Oct 16, 2019

Cool pavement can make people hotter

Reflective coatings channel sunlight raising temperatures where pedestrians walk.

Codes and Standards | Oct 15, 2019

Utah adopts 2018 International Energy Conservation Code

Provisions include increased building envelope performance and reduced air infiltration.

Codes and Standards | Oct 14, 2019

States continue to beef up energy efficiency codes

ACEEE 50-state scorecard finds latest IECC code gaining adherents.

Codes and Standards | Oct 9, 2019

DOE releases Better Buildings Healthcare Financing Primer

Outlines financial strategies to implement energy-efficiency projects in healthcare.

Codes and Standards | Oct 8, 2019

Zero Carbon Buildings for All aims for ambitious emission reduction targets

Organization makes commitment to net zero carbon for all buildings by 2050.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021