New York City has a new Office Conversion Accelerator Team that provides a single point of contact within city government to help speed office-to-residential conversions.
Projects that create 50 or more housing units from office buildings are eligible for this new program. The program will assist owners with analyzing the zoning feasibility of individual conversion projects and help to secure necessary permits.
The city’s team will include personnel from the Department of City Planning, the Department of Buildings, the Department of Housing Preservation & Development, the Board of Standards & Appeals, and the Landmarks Preservation Commission. “Property owners of existing office buildings can seek the interagency team’s help to identify barriers to conversion and expedite pathways to overcome those barriers,” according to a city news release.
The creation of this team was recommended by an adaptive reuse study released by the city earlier this year. The study also advocated for rezoning to allow more conversions in mid-town Manhattan, parts of Queens, and the Bronx.
Mayor Eric Adams earlier this year said an area of midtown that stretches from Chelsea through the Garment District can create some 20,000 housing units through conversions.
Related Stories
Adaptive Reuse | May 7, 2018
A decade after it debuted, Beijing’s 798 Arts District is still a work in progress
China’s third-most-popular tourist attraction remains a magnet for creative tenants.
Adaptive Reuse | Apr 26, 2018
Edison Lofts building is New Jersey’s largest non-waterfront adaptive reuse project
Minno & Wasko Architects & Planners designed the building.
Adaptive Reuse | Mar 8, 2018
LEED Platinum for Memphis industrial reuse project
Memphis-based engineering firm OGCB and contractor Grinder Tabor Grinder led the removal of 54 million lb of concrete and 10 million lb of metal.
Multifamily Housing | Feb 27, 2018
Victorian era gasholders become modern residences in London
The new residences are part of the King’s Cross redevelopment scheme.
Education Facilities | Jan 8, 2018
Three former school buildings are repurposed to create mini-campus for teacher education
The $25.3 million project is currently under construction on the Winona State University campus.
Adaptive Reuse | Jan 4, 2018
Student housing development on Chapman University campus includes adaptive reuse of 1918 packing house
The Packing House was originally built for the Santiago Orange Growers Association.
Adaptive Reuse | Dec 11, 2017
Detroit's economic improvement a boon to its hotel sector
Detroit Foundation, a stylish boutique hotel, is the Motor City’s newest hospitality venue.
Adaptive Reuse | Nov 29, 2017
‘Eat-ertainment’ establishment grants abandoned air traffic control building a second life
The concept’s design reflects the golden age of flight.
Adaptive Reuse | Nov 10, 2017
Austin’s first indoor shopping mall becomes Austin Community College’s new digital media center
Renovation of the defunct mall represents Phase 2 of ACC’s $100 million adaptive reuse project.
Adaptive Reuse | Oct 23, 2017
A tableware storage space is reset to accommodate an investment firm’s headquarters in Raleigh, N.C.
This adaptive reuse establishes more direct visual and physical connections to a growing city.