New York State legislators recently passed a budget that includes a provision to allow state agencies to continue to use design-build on projects.
The legislation expands the use of design-build for four years in existing agencies and authorizes eight new projects at four more agencies. Design-build was extended for four years for these agencies:
- New York State Thru-way Authority
- Department of Transportation
- Office of Parks, Recreation and Historic preservation
- Department of Environmental Conservation
- New York State Bridge Authority
Design-build was expanded to include eight additional projects by these four agencies:
- Urban Development Corporation
- Dormitory Authority & Urban Development Corporation
- New York State Olympic Regional Development Authority
- Office of General Services
Among the eight projects are: several Olympic Regional Development Authority resorts, a new regional visitors center in Essex County, a new State Police forensics lab and a new Life Sciences Laboratory. New York has lagged behind many other states in approving design-build authority, but the state has had some impressive successes, particularly on roads and bridges, according to the Design-Build Institute.
Related Stories
Codes and Standards | Jan 13, 2017
New BIM guide for owners released
National Institute of Building Sciences releases a manual for developing standard set of BIM documents.
Codes and Standards | Jan 11, 2017
OSHA prompts more proactive approach to construction site safety
Remote operated camera systems are being used to mitigate risk in real time.
Codes and Standards | Jan 10, 2017
Plunging solar power costs making PVs more compelling for owners, developers
Technical and manufacturing advances are driving down prices.
Codes and Standards | Jan 9, 2017
Boston’s plans for new development at odds with flood projections
One plan calls for building in areas predicted to be flooded during high tides as sea levels rise.
Codes and Standards | Jan 9, 2017
New LEED for Cities, LEED for Communities pilot certifications unveiled
Requires tracking of performance data and progress toward goals.
Codes and Standards | Jan 9, 2017
China claims top ranking outside of U.S. for total LEED-certified space
Canada, India, Brazil, and Korea round out top 5.
Codes and Standards | Jan 6, 2017
OSHA prompts more proactive approach to construction site safety
Remote operated camera systems are being used to mitigate risk in real time.
Codes and Standards | Jan 5, 2017
2018 building energy code upholds efficiency gains
Efforts to scale back efficiency requirements largely defeated.
Codes and Standards | Jan 4, 2017
Low-income housing doesn’t lower neighborhood housing values
A Trulia study contradicts longstanding fears.
Codes and Standards | Jan 3, 2017
Intelligent transportation systems have implications for designers, construction firms
Sensors and Internet of Things devices will have to be embedded in infrastructure.